IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

141

matching recommendations
Reset
NAICS 325211 Plastics Material and Resin Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1063 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $461 $952 n/a
UD1063 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $760 $0 n/a
UD1063 # 04 Y:2023 04 2023 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $4,227 $2,191 n/a
UD1063 # 01 Y:2023 01 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,244 $297 n/a
UD1063 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,201 $2,583 n/a
UD1063 # 07 Y:2023 07 2023 OPTIMIZE PLANT POWER FACTOR $3,994 $10,500 n/a
UD1063 # 06 Y:2023 06 2023 INSTALL OCCUPANCY SENSORS $170 $200 n/a
UD1062 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,907 $0 Not Implemented
UD1062 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $727 $952 Not Implemented
UD1062 # 03 Y:2023 03 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $705 $260 Not Implemented
UD1062 # 05 Y:2023 05 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $342 $0 Not Implemented
UD1062 # 02 Y:2023 02 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,486 $0 Not Implemented
UD1062 # 06 Y:2023 06 2023 INSTALL OCCUPANCY SENSORS $1,152 $2,000 Implemented
WV0574 # 07 Y:2019 07 2019 DEVELOP A REPAIR/REPLACE POLICY $2,811 $540 Implemented
WV0574 # 06 Y:2019 06 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,235 $0 Implemented
WV0574 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,691 $46 Implemented
WV0574 # 02 Y:2019 02 2019 INSTALL OCCUPANCY SENSORS $14,108 $10,162 Implemented
WV0574 # 09 Y:2019 09 2019 MINIMIZE WATER USAGE $615 $2,100 Not Implemented
WV0574 # 04 Y:2019 04 2019 UPGRADE CONTROLS ON COMPRESSORS $9,048 $8,000 Not Implemented
WV0574 # 01 Y:2019 01 2019 REVISE RAW MATERIAL SPECS $26,910 $52,500 Not Implemented
WV0574 # 08 Y:2019 08 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,169 $1,725 Implemented
WV0574 # 03 Y:2019 03 2019 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $9,375 $3,276 Not Implemented
WV0535 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,812 $8,931 Not Implemented
WV0535 # 05 Y:2016 05 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,030 $6,200 Not Implemented
WV0535 # 06 Y:2016 06 2016 DEVELOP A REPAIR/REPLACE POLICY $1,538 $578 Implemented