IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

166

matching recommendations
Reset
NAICS 3253 Pesticide, Fertilizer, and Other Agricultural Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0584 # 01 Y:2025 01 2025 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,871 $0 n/a
LE0584 # 04 Y:2025 04 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,377 $2,400 n/a
LE0584 # 05 Y:2025 05 2025 INSTALL BACK-UP EQUIPMENT $148,846 $350,000 n/a
LE0584 # 07 Y:2025 07 2025 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $9,000 $31,500 n/a
LE0584 # 08 Y:2025 08 2025 PREHEAT COMBUSTION AIR WITH WASTE HEAT $8,045 $30,000 n/a
LE0584 # 06 Y:2025 06 2025 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,853 $5,000 n/a
LE0584 # 03 Y:2025 03 2025 INSTALL TIMERS AND/OR THERMOSTATS $1,504 $600 n/a
LE0584 # 02 Y:2025 02 2025 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,030 $100 n/a
AS0581 # 05 Y:2024 05 2024 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $161 $322 Not Implemented
AS0581 # 01 Y:2024 01 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $114,491 $1,279,371 Not Implemented
AS0581 # 02 Y:2024 02 2024 UPGRADE CONTROLS ON COMPRESSORS $30,471 $40,000 Not Implemented
AS0581 # 03 Y:2024 03 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,885 $8,703 Implemented
AS0581 # 04 Y:2024 04 2024 INSTALL OCCUPANCY SENSORS $1,195 $514 Implemented
AS0581 # 06 Y:2024 06 2024 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $80 $178 Implemented
UF0618 # 07 Y:2024 07 2024 IMPROVE SPACE COMFORT CONDITIONING $10,000 $1,931 Not Implemented
UF0618 # 06 Y:2024 06 2024 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $12,621 $12,380 Not Implemented
UF0618 # 05 Y:2024 05 2024 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $150,000 $70,000 Not Implemented
UF0618 # 04 Y:2024 04 2024 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $308,175 $14,388 Not Implemented
UF0618 # 03 Y:2024 03 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,409 $5,855 Not Implemented
UF0618 # 02 Y:2024 02 2024 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $1,789 $872 Not Implemented
UF0618 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $19,157 $112,913 Implemented
UU0252 # 01 Y:2024 01 2024 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $19,754 $108,000 Implemented
UU0252 # 03 Y:2024 03 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $1,880 $5,500 Implemented
UU0252 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,070 $4,410 Implemented
UU0252 # 02 Y:2024 02 2024 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $53,389 $212,000 Implemented