IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

59

matching recommendations
Reset
NAICS 32531 Fertilizer Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0703 # 02 Y:2016 02 2016 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $24,300 $11,400 Implemented
AM0703 # 05 Y:2016 05 2016 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $3,830 $1,000 Implemented
AM0703 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,480 $445 Implemented
AM0703 # 03 Y:2016 03 2016 MOVE PRODUCT USING MECHANICAL MEANS $23,300 $66,600 Implemented
UD0911 # 05 Y:2014 05 2014 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $14,978 $20,079 Implemented
UD0911 # 04 Y:2014 04 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,693 $0 Not Implemented
UD0911 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,866 $8,000 Not Implemented
UD0911 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,620 $1,000 Implemented
UD0911 # 01 Y:2014 01 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,544 $0 Implemented
UD0911 # 10 Y:2014 10 2014 USE DECANTING, FLOTATION TO REMOVE CONTAMINANTS $262,802 $80,000 Not Implemented
UD0911 # 06 Y:2014 06 2014 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $74,000 $124,534 Implemented
UD0911 # 07 Y:2014 07 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $18,375 $7,000 Not Implemented
UD0911 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,256 $47,188 Implemented
UD0911 # 09 Y:2014 09 2014 USE PHOTOCELL CONTROLS $732 $1,440 Not Implemented
MZ0119 # 01 Y:2013 01 2013 RECOVER WASTE HEAT FROM EQUIPMENT $2,963 $0 Implemented
MZ0119 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,154 $14,260 Implemented
MZ0119 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $1,150 $900 Implemented
MZ0119 # 04 Y:2013 04 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,728 $0 Not Implemented
UW0037 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,711 $1,060 Implemented
UW0037 # 03 Y:2010 03 2010 RECOVER WASTE HEAT FROM EQUIPMENT $921 $1,842 Not Implemented
UW0037 # 02 Y:2010 02 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $709 $0 Implemented
MS0351 # 05 Y:2010 05 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,134 $210 Not Implemented
MS0351 # 01 Y:2010 01 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $104,520 $29,318 Not Implemented
MS0351 # 02 Y:2010 02 2010 REPAIR AND ELIMINATE STEAM LEAKS $80,833 $872 Implemented
MS0351 # 03 Y:2010 03 2010 PAY UTILITY BILLS ON TIME $36,706 $0 Implemented