IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,073

matching recommendations
Reset
NAICS 3254 Pharmaceutical and Medicine Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0413 # 03 Y:2009 03 2009 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $31,920 $13,200 Implemented
SD0413 # 04 Y:2009 04 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,991 $20,850 Implemented
SD0413 # 05 Y:2009 05 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,118 $9,600 Implemented
SD0413 # 06 Y:2009 06 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,623 $13,300 Implemented
SD0413 # 07 Y:2009 07 2009 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $16,800 $2,000 Implemented
SD0413 # 08 Y:2009 08 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,905 $13,511 Implemented
SD0413 # 09 Y:2009 09 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $25,825 $17,794 Not Implemented
SD0413 # 10 Y:2009 10 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,202 $0 Not Implemented
SD0413 # 11 Y:2009 11 2009 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,764 $1,725 Not Implemented
SD0413 # 12 Y:2009 12 2009 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $992 $0 Not Implemented
DL0031 # 01 Y:2008 01 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $3,200 $0 Not Implemented
DL0031 # 02 Y:2008 02 2008 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $693 $0 Implemented
DL0031 # 03 Y:2008 03 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,826 $0 Not Implemented
DL0031 # 04 Y:2008 04 2008 INSTALL OCCUPANCY SENSORS $2,224 $0 Not Implemented
DL0031 # 05 Y:2008 05 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,809 $229 Implemented
DL0031 # 06 Y:2008 06 2008 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $7,857 $5,600 Not Implemented
DL0031 # 07 Y:2008 07 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,430 $0 Not Implemented
DL0031 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,757 $0 Not Implemented
DL0031 # 09 Y:2008 09 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,944 $7,500 Implemented
DL0028 # 01 Y:2008 01 2008 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $122,000 $160,000 Not Implemented
DL0028 # 02 Y:2008 02 2008 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $47,800 $15,000 Implemented
DL0028 # 03 Y:2008 03 2008 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $10,400 $5,000 Not Implemented
DL0028 # 04 Y:2008 04 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $13,700 $3,000 Implemented
DL0028 # 05 Y:2008 05 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,900 $2,520 Implemented
DL0028 # 06 Y:2008 06 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,080 $500 Not Implemented