IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
NAICS 3254 Pharmaceutical and Medicine Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0158 # 08 Y:2016 08 2016 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $20,534 $96,100 Implemented
DL0158 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $96,070 $380,000 Implemented
DL0158 # 05 Y:2016 05 2016 REDUCE HEAT GAIN BY WINDOW TINTING $54,090 $104,500 Implemented
DL0158 # 02 Y:2016 02 2016 REDUCE VENTILATION AIR $310,823 $38,750 Implemented
DL0102 # 02 Y:2013 02 2013 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $25,460 $100 Implemented
DL0102 # 01 Y:2013 01 2013 REDUCE VENTILATION AIR $31,820 $3,200 Implemented
DL0062 # 08 Y:2010 08 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,900 $30 Implemented
DL0062 # 06 Y:2010 06 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,000 $5,000 Implemented
DL0053 # 11 Y:2010 11 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,000 $10 Implemented
DL0053 # 15 Y:2010 15 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,000 $31,440 Implemented
DL0053 # 14 Y:2010 14 2010 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $18,000 $8,600 Implemented
DL0053 # 13 Y:2010 13 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,600 $100 Implemented
DL0053 # 09 Y:2010 09 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $40,900 $10,240 Implemented
DL0053 # 08 Y:2010 08 2010 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $61,000 $20 Implemented
DL0053 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $74,000 $700 Implemented
DL0053 # 05 Y:2010 05 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $80,000 $30,000 Implemented
DL0053 # 04 Y:2010 04 2010 INCREASE AMOUNT OF CONDENSATE RETURNED $58,000 $60,000 Implemented
DL0053 # 03 Y:2010 03 2010 ADD AREA LIGHTING SWITCHES $123,000 $29,200 Implemented
DL0053 # 01 Y:2010 01 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $358,000 $4,000 Implemented
DL0028 # 02 Y:2008 02 2008 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $47,800 $15,000 Implemented
DL0028 # 09 Y:2008 09 2008 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $1,400 $400 Implemented
DL0028 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,290 $12,000 Implemented
DL0028 # 05 Y:2008 05 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,900 $2,520 Implemented
DL0028 # 04 Y:2008 04 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $13,700 $3,000 Implemented