Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
155
matching recommendationsNAICS | 3254 | Pharmaceutical and Medicine Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0439 # 02 Y:2024 | 02 | 2024 | APPLY FOR INVESTMENT INCENTIVES | $187,800 | $0 | n/a |
MI0439 # 03 Y:2024 | 03 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $48,834 | $0 | n/a |
MI0439 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $261 | $275 | n/a |
MI0439 # 05 Y:2024 | 05 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,889 | $70 | n/a |
MI0439 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,323 | $2,000 | n/a |
MI0439 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $415,397 | $930,319 | n/a |
MI0436 # 09 Y:2023 | 09 | 2023 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,045 | $0 | n/a |
MI0436 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,894 | $1,980 | n/a |
MI0436 # 05 Y:2023 | 05 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,785 | $13,440 | n/a |
MI0436 # 04 Y:2023 | 04 | 2023 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $5,903 | $1,827 | n/a |
MI0436 # 06 Y:2023 | 06 | 2023 | AIR CONDITION ONLY SPACE NECESSARY | $3,663 | $3,360 | n/a |
MI0436 # 07 Y:2023 | 07 | 2023 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $2,508 | $0 | n/a |
MI0436 # 02 Y:2023 | 02 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $22,029 | $480 | n/a |
MI0436 # 01 Y:2023 | 01 | 2023 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $3,141,406 | $1,000,000 | n/a |
MI0436 # 08 Y:2023 | 08 | 2023 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $1,021 | $199 | n/a |
MI0395 # 02 Y:2021 | 02 | 2021 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $14,790 | $1,380 | Implemented |
MI0395 # 07 Y:2021 | 07 | 2021 | INSTALL OCCUPANCY SENSORS | $613 | $255 | Implemented |
MI0395 # 04 Y:2021 | 04 | 2021 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $6,816 | $15,328 | Not Implemented |
MI0395 # 05 Y:2021 | 05 | 2021 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $5,744 | $26,640 | Not Implemented |
MI0395 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,523 | $1,980 | Implemented |
MI0395 # 01 Y:2021 | 01 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $17,603 | $2,100 | Not Implemented |
MI0395 # 06 Y:2021 | 06 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $944 | $811 | Implemented |
MI0364 # 06 Y:2019 | 06 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,784 | $7,500 | Not Implemented |
MI0364 # 05 Y:2019 | 05 | 2019 | AIR CONDITION ONLY SPACE NECESSARY | $5,164 | $16,940 | Implemented |
MI0364 # 02 Y:2019 | 02 | 2019 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $21,750 | $35,446 | Implemented |