Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
NAICS 3254 Pharmaceutical and Medicine Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0414 # 06 Y:2016 06 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $330 $1,140 Implemented
LE0414 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,482 $10,500 Implemented
LE0414 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,088 $14,625 Implemented
LE0414 # 03 Y:2016 03 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,251 $1,460 Not Implemented
LE0414 # 02 Y:2016 02 2016 PREHEAT COMBUSTION AIR WITH WASTE HEAT $34,860 $36,000 Implemented
LE0414 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,057 $0 Implemented
LE0289 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,888 $2,824 Implemented
LE0289 # 10 Y:2009 10 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,734 $18,122 Not Implemented
LE0289 # 09 Y:2009 09 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,333 $6,137 Not Implemented
LE0289 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,474 $16,830 Not Implemented
LE0289 # 07 Y:2009 07 2009 USE SOLAR HEAT TO HEAT WATER $1,380 $3,640 Not Implemented
LE0289 # 05 Y:2009 05 2009 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $3,908 $12,000 Not Implemented
LE0289 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,121 $304 Implemented
LE0289 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,495 $11,500 Not Implemented
LE0289 # 02 Y:2009 02 2009 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $12,698 $2,600 Not Implemented
LE0289 # 01 Y:2009 01 2009 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $19,778 $20,000 Implemented
LE0221 # 01 Y:2005 01 2005 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $20,632 $500 Implemented
LE0221 # 05 Y:2005 05 2005 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,628 $500 Not Implemented
LE0221 # 04 Y:2005 04 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,761 $6,000 Not Implemented
LE0221 # 03 Y:2005 03 2005 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $4,200 $200 Not Implemented
LE0221 # 02 Y:2005 02 2005 REDUCE VENTILATION AIR $6,676 $200 Not Implemented