IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

51

matching recommendations
Reset
NAICS 32541 Pharmaceutical and Medicine Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0119 # 02 Y:2017 02 2017 OPTIMIZE PLANT POWER FACTOR $4,431 $4,250 Not Implemented
UU0119 # 08 Y:2017 08 2017 COMBINE UTILITY METERS $657 $1,125 Not Implemented
UU0119 # 07 Y:2017 07 2017 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $1,100 $0 Not Implemented
UU0119 # 06 Y:2017 06 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,324 $3,000 Not Implemented
UU0119 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,903 $2,472 Implemented
UU0119 # 04 Y:2017 04 2017 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $2,918 $0 Not Implemented
UU0119 # 03 Y:2017 03 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,428 $0 Not Implemented
UU0119 # 01 Y:2017 01 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,742 $3,975 Not Implemented
UU0119 # 09 Y:2017 09 2017 INSTALL OCCUPANCY SENSORS $127 $240 Implemented
UU0074 # 06 Y:2004 06 2004 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,570 $12 Implemented
UU0074 # 05 Y:2004 05 2004 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $19,210 $25 Not Implemented
UU0074 # 04 Y:2004 04 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,620 $4 Not Implemented
UU0074 # 03 Y:2004 03 2004 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,750 $5,000 Not Implemented
UU0074 # 02 Y:2004 02 2004 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $6,200 $17,000 Not Implemented
UU0074 # 01 Y:2004 01 2004 RECOVER WASTE HEAT FROM EQUIPMENT $29,620 $45,000 Not Implemented
UU0071 # 01 Y:2004 01 2004 OPTIMIZE PLANT POWER FACTOR $3,645 $2,000 Implemented
UU0071 # 02 Y:2004 02 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,294 $0 Implemented
UU0071 # 03 Y:2004 03 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,655 $3,894 Implemented
UU0071 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $1,950 $400 Implemented
UU0071 # 05 Y:2004 05 2004 USE PHOTOCELL CONTROLS $2,376 $2,400 Not Implemented
UU0064 # 06 Y:2004 06 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $5,480 $0 Implemented
UU0064 # 05 Y:2004 05 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $1,785 $0 Implemented
UU0064 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $1,252 $1,754 Implemented
UU0064 # 03 Y:2004 03 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,624 $2,400 Not Implemented
UU0064 # 02 Y:2004 02 2004 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $2,876 $2,255 Implemented