Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
51
matching recommendationsNAICS | 32541 | Pharmaceutical and Medicine Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0119 # 02 Y:2017 | 02 | 2017 | OPTIMIZE PLANT POWER FACTOR | $4,431 | $4,250 | Not Implemented |
UU0119 # 08 Y:2017 | 08 | 2017 | COMBINE UTILITY METERS | $657 | $1,125 | Not Implemented |
UU0119 # 07 Y:2017 | 07 | 2017 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $1,100 | $0 | Not Implemented |
UU0119 # 06 Y:2017 | 06 | 2017 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,324 | $3,000 | Not Implemented |
UU0119 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,903 | $2,472 | Implemented |
UU0119 # 04 Y:2017 | 04 | 2017 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $2,918 | $0 | Not Implemented |
UU0119 # 03 Y:2017 | 03 | 2017 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,428 | $0 | Not Implemented |
UU0119 # 01 Y:2017 | 01 | 2017 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $5,742 | $3,975 | Not Implemented |
UU0119 # 09 Y:2017 | 09 | 2017 | INSTALL OCCUPANCY SENSORS | $127 | $240 | Implemented |
UU0074 # 06 Y:2004 | 06 | 2004 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,570 | $12 | Implemented |
UU0074 # 05 Y:2004 | 05 | 2004 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $19,210 | $25 | Not Implemented |
UU0074 # 04 Y:2004 | 04 | 2004 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,620 | $4 | Not Implemented |
UU0074 # 03 Y:2004 | 03 | 2004 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,750 | $5,000 | Not Implemented |
UU0074 # 02 Y:2004 | 02 | 2004 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $6,200 | $17,000 | Not Implemented |
UU0074 # 01 Y:2004 | 01 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $29,620 | $45,000 | Not Implemented |
UU0071 # 01 Y:2004 | 01 | 2004 | OPTIMIZE PLANT POWER FACTOR | $3,645 | $2,000 | Implemented |
UU0071 # 02 Y:2004 | 02 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,294 | $0 | Implemented |
UU0071 # 03 Y:2004 | 03 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,655 | $3,894 | Implemented |
UU0071 # 04 Y:2004 | 04 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,950 | $400 | Implemented |
UU0071 # 05 Y:2004 | 05 | 2004 | USE PHOTOCELL CONTROLS | $2,376 | $2,400 | Not Implemented |
UU0064 # 06 Y:2004 | 06 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $5,480 | $0 | Implemented |
UU0064 # 05 Y:2004 | 05 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,785 | $0 | Implemented |
UU0064 # 04 Y:2004 | 04 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,252 | $1,754 | Implemented |
UU0064 # 03 Y:2004 | 03 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,624 | $2,400 | Not Implemented |
UU0064 # 02 Y:2004 | 02 | 2004 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $2,876 | $2,255 | Implemented |