IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

119

matching recommendations
Reset
NAICS 32541 Pharmaceutical and Medicine Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0378 # 03 Y:2009 03 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $2,063 $500 Implemented
SF0378 # 04 Y:2009 04 2009 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $396 $75 Not Implemented
SF0378 # 05 Y:2009 05 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,409 $12,868 Not Implemented
SF0378 # 06 Y:2009 06 2009 INSTALL OCCUPANCY SENSORS $13,576 $17,518 Not Implemented
SF0378 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $559 $840 Not Implemented
SF0378 # 08 Y:2009 08 2009 USE PHOTOCELL CONTROLS $771 $1,925 Not Implemented
SD0413 # 01 Y:2009 01 2009 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $151,192 $1,125,000 Not Implemented
SD0413 # 02 Y:2009 02 2009 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $57,036 $120,000 Implemented
SD0413 # 03 Y:2009 03 2009 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $31,920 $13,200 Implemented
SD0413 # 04 Y:2009 04 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,991 $20,850 Implemented
SD0413 # 05 Y:2009 05 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,118 $9,600 Implemented
SD0413 # 06 Y:2009 06 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,623 $13,300 Implemented
SD0413 # 07 Y:2009 07 2009 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $16,800 $2,000 Implemented
SD0413 # 08 Y:2009 08 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,905 $13,511 Implemented
SD0413 # 09 Y:2009 09 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $25,825 $17,794 Not Implemented
SD0413 # 10 Y:2009 10 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,202 $0 Not Implemented
SD0413 # 11 Y:2009 11 2009 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,764 $1,725 Not Implemented
SD0413 # 12 Y:2009 12 2009 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $992 $0 Not Implemented
SF0340 # 01 Y:2007 01 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,354 $0 Implemented
SF0340 # 02 Y:2007 02 2007 REPAIR AND ELIMINATE STEAM LEAKS $12,059 $320 Implemented
SF0340 # 03 Y:2007 03 2007 REPAIR AND ELIMINATE STEAM LEAKS $6,510 $0 Implemented
SF0340 # 04 Y:2007 04 2007 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $155,963 $36,556 Implemented
SF0340 # 05 Y:2007 05 2007 Cooling Towers $14,070 $3,000 Not Implemented
SF0340 # 06 Y:2007 06 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $6,921 $1,133 Not Implemented
SF0340 # 07 Y:2007 07 2007 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $12,710 $4,246 Not Implemented