IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,078

matching recommendations
Reset
NAICS 32541 Pharmaceutical and Medicine Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0071 # 01 Y:2004 01 2004 OPTIMIZE PLANT POWER FACTOR $3,645 $2,000 Implemented
UU0071 # 02 Y:2004 02 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,294 $0 Implemented
UU0071 # 03 Y:2004 03 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,655 $3,894 Implemented
UU0071 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $1,950 $400 Implemented
UU0071 # 05 Y:2004 05 2004 USE PHOTOCELL CONTROLS $2,376 $2,400 Not Implemented
MI0091 # 01 Y:2004 01 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $19,034 $35,520 Implemented
MI0091 # 02 Y:2004 02 2004 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $7,075 $150 Not Implemented
MI0091 # 03 Y:2004 03 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,670 $3,105 Not Implemented
MI0091 # 04 Y:2004 04 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $26,520 $1,000 Implemented
MI0091 # 05 Y:2004 05 2004 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $2,500 $120 Not Implemented
UU0064 # 01 Y:2004 01 2004 RECOVER WASTE HEAT FROM EQUIPMENT $14,228 $70,000 Not Implemented
UU0064 # 02 Y:2004 02 2004 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $2,876 $2,255 Implemented
UU0064 # 03 Y:2004 03 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,624 $2,400 Not Implemented
UU0064 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $1,252 $1,754 Implemented
UU0064 # 05 Y:2004 05 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $1,785 $0 Implemented
UU0064 # 06 Y:2004 06 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $5,480 $0 Implemented
WI0472 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,956 $16,640 n/a
WI0472 # 02 Y:2004 02 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,258 $9,780 n/a
WI0472 # 03 Y:2004 03 2004 INSTALL OCCUPANCY SENSORS $1,700 $5,500 n/a
WI0472 # 04 Y:2004 04 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $596 $640 n/a
WI0472 # 05 Y:2004 05 2004 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $1,375 $1,145 n/a
WI0472 # 06 Y:2004 06 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,106 $5,500 n/a
WI0472 # 07 Y:2004 07 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $566 $500 n/a
WI0472 # 08 Y:2004 08 2004 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,032 $700 n/a
NC0283 # 01 Y:2004 01 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $22,500 $18,300 Not Implemented