IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

163

matching recommendations
Reset
NAICS 32541 Pharmaceutical and Medicine Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0397 # 04 Y:2007 04 2007 REDESIGN PROCESS $10,558 $8,150 Not Implemented
UF0397 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,391 $590 Implemented
UF0397 # 06 Y:2007 06 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $189 $0 Implemented
UF0397 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,305 $6,526 Implemented
UF0397 # 08 Y:2007 08 2007 INSTALL OCCUPANCY SENSORS $1,504 $894 Not Implemented
UF0397 # 09 Y:2007 09 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $945 $1,521 Not Implemented
UF0364 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,914 $406 Implemented
UF0364 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,126 $19,754 Implemented
UF0364 # 03 Y:2005 03 2005 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $1,567 $94,000 Not Implemented
UF0364 # 04 Y:2005 04 2005 INSTALL OCCUPANCY SENSORS $572 $852 Not Implemented
UF0364 # 05 Y:2005 05 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $754 $0 Implemented
UF0364 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $809 $979 Not Implemented
UF0364 # 07 Y:2005 07 2005 RECYCLE FLUORESCENT LAMPS $459 $3,496 Not Implemented
UF0364 # 08 Y:2005 08 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $2,808 $957 Not Implemented
MI0107 # 01 Y:2005 01 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $5,544 $600 Not Implemented
MI0107 # 02 Y:2005 02 2005 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,756 $4,360 Not Implemented
MI0107 # 03 Y:2005 03 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,525 $100 Implemented
MI0107 # 04 Y:2005 04 2005 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,012 $4,012 Implemented
MI0107 # 05 Y:2005 05 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,325 $42 Implemented
MI0107 # 06 Y:2005 06 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,128 $0 Implemented
MI0097 # 01 Y:2005 01 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $3,490 $2,100 Not Implemented
MI0097 # 02 Y:2005 02 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $59,412 $800 Not Implemented
MI0097 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,212 $52,535 Not Implemented
MI0097 # 04 Y:2005 04 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,883 $30 Not Implemented
MI0097 # 05 Y:2005 05 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,188 $7,077 Not Implemented