IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

72

matching recommendations
Reset
NAICS 32541 Pharmaceutical and Medicine Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0445 # 08 Y:2024 08 2024 INSTALL OCCUPANCY SENSORS $3,269 $2,860 n/a
MI0445 # 02 Y:2024 02 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $217,248 $42,472 n/a
MI0445 # 03 Y:2024 03 2024 PAY UTILITY BILLS ON TIME $80,165 $0 n/a
MI0445 # 04 Y:2024 04 2024 OPTIMIZE PLANT POWER FACTOR $46,588 $99,444 n/a
MI0445 # 05 Y:2024 05 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $32,574 $11,027 n/a
MI0445 # 01 Y:2024 01 2024 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $427,475 $602,500 n/a
MI0445 # 06 Y:2024 06 2024 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $19,584 $150 n/a
MI0445 # 07 Y:2024 07 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,583 $5,793 n/a
MI0359 # 09 Y:2019 09 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $47,169 $115,295 Not Implemented
MI0359 # 10 Y:2019 10 2019 USE SOLAR HEAT TO HEAT WATER $33,548 $29,934 Not Implemented
MI0359 # 08 Y:2019 08 2019 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $52,238 $52,238 Not Implemented
MI0359 # 07 Y:2019 07 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $53,837 $1,980 Implemented
MI0359 # 05 Y:2019 05 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $67,825 $25,283 Not Implemented
MI0359 # 04 Y:2019 04 2019 RECOVER WASTE HEAT FROM EQUIPMENT $128,514 $60,610 Not Implemented
MI0359 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $182,349 $33,814 Implemented
MI0359 # 12 Y:2019 12 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $26,313 $7,820 Not Implemented
MI0359 # 13 Y:2019 13 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $23,546 $480 Implemented
MI0359 # 11 Y:2019 11 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $32,799 $160 Not Implemented
MI0359 # 01 Y:2019 01 2019 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $547,956 $675,600 Implemented
MI0359 # 06 Y:2019 06 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $59,287 $960 Implemented
MI0359 # 02 Y:2019 02 2019 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $281,283 $181,281 Implemented
MI0339 # 02 Y:2018 02 2018 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $279,023 $250,000 Not Implemented
MI0339 # 01 Y:2018 01 2018 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $1,225,133 $10,935,180 Implemented
MI0339 # 05 Y:2018 05 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $47,520 $480 Not Implemented
MI0339 # 08 Y:2018 08 2018 INSTALL OCCUPANCY SENSORS $11,795 $9,000 Not Implemented