IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

148

matching recommendations
Reset
NAICS 325411 Medicinal and Botanical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0221 # 01 Y:2005 01 2005 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $20,632 $500 Implemented
LE0221 # 02 Y:2005 02 2005 REDUCE VENTILATION AIR $6,676 $200 Not Implemented
LE0221 # 03 Y:2005 03 2005 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $4,200 $200 Not Implemented
LE0221 # 04 Y:2005 04 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,761 $6,000 Not Implemented
LE0221 # 05 Y:2005 05 2005 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,628 $500 Not Implemented
CO0569 # 01 Y:2005 01 2005 RECOVER WASTE HEAT FROM EQUIPMENT $22,680 $3,500 Not Implemented
CO0569 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,470 $1,000 Implemented
CO0569 # 03 Y:2005 03 2005 USE SOLAR HEAT TO HEAT WATER $8,940 $108,000 Not Implemented
CO0569 # 04 Y:2005 04 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,930 $7,590 Implemented
CO0569 # 05 Y:2005 05 2005 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $2,040 $1,980 Implemented
CO0569 # 06 Y:2005 06 2005 USE SOLAR HEAT TO HEAT MAKE-UP AIR $17,660 $106,080 Not Implemented
CO0569 # 07 Y:2005 07 2005 INSTALL SKYLIGHTS $9,370 $56,000 Not Implemented
CO0569 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,770 $3,520 Implemented
CO0569 # 09 Y:2005 09 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,600 $1,980 Implemented
CO0569 # 10 Y:2005 10 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,350 $5,400 Not Implemented
CO0569 # 11 Y:2005 11 2005 INSTALL OCCUPANCY SENSORS $560 $710 Implemented
AS0350 # 01 Y:2003 01 2003 INSTALL SKYLIGHTS $2,149 $8,264 Not Implemented
AS0350 # 02 Y:2003 02 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,205 $255 Not Implemented
AS0350 # 03 Y:2003 03 2003 INSTALL OCCUPANCY SENSORS $1,132 $1,575 Not Implemented
AS0350 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,590 $20 Not Implemented
AS0350 # 05 Y:2003 05 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,725 $2,550 Not Implemented
AS0350 # 06 Y:2003 06 2003 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $921 $1,300 Not Implemented
AS0350 # 07 Y:2003 07 2003 INSTALL AUTOMATIC PACKING EQUIPMENT $40,475 $57,000 Not Implemented