Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
769
matching recommendationsNAICS | 325412 | Pharmaceutical Preparation Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0491 # 02 Y:2019 | 02 | 2019 | ELIMINATE/REDUCE AN OPERATION | $4,160 | $940 | Not Implemented |
SU0491 # 03 Y:2019 | 03 | 2019 | REDUCE VENTILATION AIR | $1,938 | $934 | Not Implemented |
SU0491 # 04 Y:2019 | 04 | 2019 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $405 | $542 | Not Implemented |
SU0491 # 05 Y:2019 | 05 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,086 | $1,842 | Not Implemented |
SU0491 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $38,429 | $102,442 | Not Implemented |
SU0491 # 07 Y:2019 | 07 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $385 | $1,387 | Not Implemented |
GT0934 # 01 Y:2019 | 01 | 2019 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $2,153 | $250 | Implemented |
GT0934 # 02 Y:2019 | 02 | 2019 | INSULATE BARE EQUIPMENT | $2,334 | $1,238 | Implemented |
GT0934 # 03 Y:2019 | 03 | 2019 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $9,210 | $19,899 | Not Implemented |
GT0934 # 04 Y:2019 | 04 | 2019 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $305,911 | $903,775 | Not Implemented |
GT0934 # 05 Y:2019 | 05 | 2019 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $445 | $2,770 | Implemented |
GT0934 # 06 Y:2019 | 06 | 2019 | USE SOLAR HEAT FOR HEAT | $37,938 | $246,597 | Implemented |
LE0482 # 01 Y:2019 | 01 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,428 | $1,040 | Implemented |
LE0482 # 02 Y:2019 | 02 | 2019 | REPAIR OR REPLACE STEAM TRAPS | $14,878 | $3,810 | Implemented |
LE0482 # 03 Y:2019 | 03 | 2019 | INSTALL TIMERS AND/OR THERMOSTATS | $215 | $70 | Not Implemented |
LE0482 # 04 Y:2019 | 04 | 2019 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $35,019 | $27,273 | Not Implemented |
LE0482 # 05 Y:2019 | 05 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $743 | $2,613 | Implemented |
LE0482 # 06 Y:2019 | 06 | 2019 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,620 | $18,280 | Implemented |
LE0482 # 07 Y:2019 | 07 | 2019 | REPLACE BOILER | $45,608 | $325,000 | Not Implemented |
MI0359 # 01 Y:2019 | 01 | 2019 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $547,956 | $675,600 | Implemented |
MI0359 # 02 Y:2019 | 02 | 2019 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $281,283 | $181,281 | Implemented |
MI0359 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $182,349 | $33,814 | Implemented |
MI0359 # 04 Y:2019 | 04 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $128,514 | $60,610 | Not Implemented |
MI0359 # 05 Y:2019 | 05 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $67,825 | $25,283 | Not Implemented |
MI0359 # 06 Y:2019 | 06 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $59,287 | $960 | Implemented |