IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

769

matching recommendations
Reset
NAICS 325412 Pharmaceutical Preparation Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0443 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46,572 $108,715 Implemented
LE0443 # 07 Y:2017 07 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,458 $8,500 Not Implemented
LE0443 # 08 Y:2017 08 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,903 $9,500 Not Implemented
LE0443 # 09 Y:2017 09 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,710 $37,500 Not Implemented
LE0443 # 10 Y:2017 10 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $385,040 $1,360,000 Not Implemented
LE0443 # 11 Y:2017 11 2017 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $8,886 $32,000 Not Implemented
LE0443 # 12 Y:2017 12 2017 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $14,690 $63,000 Implemented
LE0443 # 13 Y:2017 13 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,256 $10,938 Implemented
LE0443 # 14 Y:2017 14 2017 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,524 $32,000 Implemented
MI0319 # 01 Y:2017 01 2017 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $288,813 $48,000 Implemented
MI0319 # 02 Y:2017 02 2017 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $172,588 $249,599 Not Implemented
MI0319 # 03 Y:2017 03 2017 UPGRADE OBSOLETE EQUIPMENT $120,000 $42,000 Not Implemented
MI0319 # 04 Y:2017 04 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $84,550 $59,400 Implemented
MI0319 # 05 Y:2017 05 2017 PAY UTILITY BILLS ON TIME $29,840 $0 Implemented
MI0319 # 06 Y:2017 06 2017 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $26,311 $12,000 Not Implemented
MI0319 # 07 Y:2017 07 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,257 $1,670 Implemented
TT0194 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,040 $34,731 Not Implemented
TT0194 # 02 Y:2017 02 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $6,861 $25 Not Implemented
TT0194 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,250 $3,050 Not Implemented
TT0194 # 04 Y:2017 04 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,281 $3,000 Not Implemented
TT0194 # 05 Y:2017 05 2017 APPLY FOR INVESTMENT INCENTIVES $1,314 $20 Not Implemented
TT0194 # 06 Y:2017 06 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,213 $94 Not Implemented
TT0187 # 01 Y:2017 01 2017 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $77,734 $24,500 Not Implemented
TT0187 # 02 Y:2017 02 2017 INCREASE AMOUNT OF CONDENSATE RETURNED $52,000 $14,250 Implemented
TT0187 # 03 Y:2017 03 2017 UPGRADE CONTROLS ON COMPRESSORS $24,005 $30,000 Implemented