IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

67

matching recommendations
Reset
NAICS 325412 Pharmaceutical Preparation Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0623 # 02 Y:2024 02 2024 REDUCE VENTILATION AIR $4,851 $0 n/a
SF0623 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,599 $3,962 n/a
SF0623 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $4,288 $0 n/a
SF0623 # 03 Y:2024 03 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,887 $1,146 n/a
SF0623 # 05 Y:2024 05 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,720 $4,257 n/a
SD0500 # 07 Y:2015 07 2015 USE PHOTOCELL CONTROLS $1,308 $2,775 Implemented
SD0500 # 02 Y:2015 02 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $105,336 $417,200 Implemented
SD0500 # 01 Y:2015 01 2015 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $326,647 $943,500 Implemented
SD0500 # 03 Y:2015 03 2015 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $9,500 $500 Not Implemented
SD0500 # 05 Y:2015 05 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,931 $400 Not Implemented
SD0500 # 06 Y:2015 06 2015 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,651 $500 Implemented
SD0500 # 04 Y:2015 04 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,982 $3,060 Not Implemented
SF0427 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,094 $4,350 Not Implemented
SF0427 # 07 Y:2013 07 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,106 $17,609 Not Implemented
SF0427 # 08 Y:2013 08 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,429 $17,469 Not Implemented
SF0427 # 03 Y:2013 03 2013 REDUCE EXCESS STEAM BLEEDING $1,742 $1,330 Not Implemented
SF0427 # 01 Y:2013 01 2013 INSTALL SPECTRAL REFLECTORS / DELAMP $2,240 $396 Not Implemented
SF0427 # 02 Y:2013 02 2013 INSULATE FEEDWATER TANK $445 $195 Not Implemented
SF0427 # 09 Y:2013 09 2013 INSTALL OCCUPANCY SENSORS $1,310 $8,199 Not Implemented
SF0427 # 05 Y:2013 05 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,698 $8,191 Not Implemented
SF0427 # 06 Y:2013 06 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,704 $5,524 Not Implemented
SF0378 # 05 Y:2009 05 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,409 $12,868 Not Implemented
SF0378 # 08 Y:2009 08 2009 USE PHOTOCELL CONTROLS $771 $1,925 Not Implemented
SF0378 # 06 Y:2009 06 2009 INSTALL OCCUPANCY SENSORS $13,576 $17,518 Not Implemented
SF0378 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $559 $840 Not Implemented