Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
62
matching recommendationsNAICS | 325412 | Pharmaceutical Preparation Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0500 # 02 Y:2015 | 02 | 2015 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $105,336 | $417,200 | Implemented |
SD0500 # 03 Y:2015 | 03 | 2015 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $9,500 | $500 | Not Implemented |
SD0500 # 04 Y:2015 | 04 | 2015 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,982 | $3,060 | Not Implemented |
SD0500 # 05 Y:2015 | 05 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,931 | $400 | Not Implemented |
SD0500 # 06 Y:2015 | 06 | 2015 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $4,651 | $500 | Implemented |
SD0500 # 07 Y:2015 | 07 | 2015 | USE PHOTOCELL CONTROLS | $1,308 | $2,775 | Implemented |
SD0500 # 01 Y:2015 | 01 | 2015 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $326,647 | $943,500 | Implemented |
SF0427 # 02 Y:2013 | 02 | 2013 | INSULATE FEEDWATER TANK | $445 | $195 | Not Implemented |
SF0427 # 01 Y:2013 | 01 | 2013 | INSTALL SPECTRAL REFLECTORS / DELAMP | $2,240 | $396 | Not Implemented |
SF0427 # 03 Y:2013 | 03 | 2013 | REDUCE EXCESS STEAM BLEEDING | $1,742 | $1,330 | Not Implemented |
SF0427 # 09 Y:2013 | 09 | 2013 | INSTALL OCCUPANCY SENSORS | $1,310 | $8,199 | Not Implemented |
SF0427 # 07 Y:2013 | 07 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,106 | $17,609 | Not Implemented |
SF0427 # 04 Y:2013 | 04 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,094 | $4,350 | Not Implemented |
SF0427 # 05 Y:2013 | 05 | 2013 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,698 | $8,191 | Not Implemented |
SF0427 # 06 Y:2013 | 06 | 2013 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,704 | $5,524 | Not Implemented |
SF0427 # 08 Y:2013 | 08 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,429 | $17,469 | Not Implemented |
SF0378 # 02 Y:2009 | 02 | 2009 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,697 | $0 | Implemented |
SF0378 # 07 Y:2009 | 07 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $559 | $840 | Not Implemented |
SF0378 # 01 Y:2009 | 01 | 2009 | ADJUST VENTS TO MINIMIZE ENERGY USE | $4,936 | $0 | Not Implemented |
SF0378 # 06 Y:2009 | 06 | 2009 | INSTALL OCCUPANCY SENSORS | $13,576 | $17,518 | Not Implemented |
SF0378 # 08 Y:2009 | 08 | 2009 | USE PHOTOCELL CONTROLS | $771 | $1,925 | Not Implemented |
SF0378 # 05 Y:2009 | 05 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $28,409 | $12,868 | Not Implemented |
SF0378 # 04 Y:2009 | 04 | 2009 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $396 | $75 | Not Implemented |
SF0378 # 03 Y:2009 | 03 | 2009 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,063 | $500 | Implemented |
SF0340 # 09 Y:2007 | 09 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,910 | $12,188 | Not Implemented |