Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
52
matching recommendationsNAICS | 325412 | Pharmaceutical Preparation Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0479 # 09 Y:2013 | 09 | 2013 | INSULATE BARE EQUIPMENT | $533 | $350 | Implemented |
NC0479 # 08 Y:2013 | 08 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,059 | $2,867 | Not Implemented |
NC0479 # 07 Y:2013 | 07 | 2013 | USE PHOTOCELL CONTROLS | $106 | $250 | Implemented |
NC0479 # 06 Y:2013 | 06 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $238 | $1,102 | Implemented |
NC0479 # 05 Y:2013 | 05 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $99 | $351 | Implemented |
NC0479 # 04 Y:2013 | 04 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,378 | $3,750 | Not Implemented |
NC0479 # 03 Y:2013 | 03 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,261 | $100 | Implemented |
NC0479 # 02 Y:2013 | 02 | 2013 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,601 | $10,000 | Implemented |
NC0479 # 01 Y:2013 | 01 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,663 | $40,000 | Not Implemented |
NC0470 # 03 Y:2012 | 03 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,336 | $1,200 | Implemented |
NC0470 # 09 Y:2012 | 09 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,234 | $33,182 | Not Implemented |
NC0470 # 06 Y:2012 | 06 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $35,967 | $85,750 | Not Implemented |
NC0470 # 10 Y:2012 | 10 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $883 | $1,575 | Implemented |
NC0470 # 11 Y:2012 | 11 | 2012 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $1,331,790 | $2,000,000 | Not Implemented |
NC0470 # 07 Y:2012 | 07 | 2012 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $12,321 | $36,400 | Not Implemented |
NC0470 # 05 Y:2012 | 05 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,091 | $400 | Not Implemented |
NC0470 # 04 Y:2012 | 04 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $671 | $1,100 | Implemented |
NC0470 # 08 Y:2012 | 08 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $39,181 | $151,669 | Implemented |
NC0470 # 02 Y:2012 | 02 | 2012 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $11,916 | $18,000 | Not Implemented |
NC0470 # 01 Y:2012 | 01 | 2012 | REDUCE EXCESSIVE BOILER BLOWDOWN | $1,179 | $0 | Implemented |
NC0443 # 05 Y:2012 | 05 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $633 | $2,440 | Not Implemented |
NC0443 # 02 Y:2012 | 02 | 2012 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $9,610 | $27,000 | Not Implemented |
NC0443 # 03 Y:2012 | 03 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,514 | $500 | Not Implemented |
NC0443 # 04 Y:2012 | 04 | 2012 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $3,960 | $10,175 | Not Implemented |
NC0443 # 06 Y:2012 | 06 | 2012 | MAKE ICE DURING OFF PEAK HOURS FOR COOLING | $28,327 | $96,000 | Not Implemented |