IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

46

matching recommendations
Reset
NAICS 325412 Pharmaceutical Preparation Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1038 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,037 $29,375 Implemented
UD1038 # 06 Y:2022 06 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,751 $0 Not Implemented
UD1038 # 05 Y:2022 05 2022 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $26,728 $32,000 Not Implemented
UD1038 # 02 Y:2022 02 2022 REDUCE VENTILATION AIR $34,366 $30,000 Not Implemented
UD1038 # 04 Y:2022 04 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,730 $0 Not Implemented
UD1038 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,646 $1,000 Implemented
UD1038 # 03 Y:2022 03 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,702 $1,750 Not Implemented
UD1024 # 10 Y:2020 10 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,326 $30,000 Not Implemented
UD1024 # 08 Y:2020 08 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,759 $10,650 Implemented
UD1024 # 09 Y:2020 09 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $40,609 $80,500 Not Implemented
UD1024 # 01 Y:2020 01 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $454 $0 Not Implemented
UD1024 # 05 Y:2020 05 2020 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $921,416 $672,400 Not Implemented
UD1024 # 07 Y:2020 07 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,282 $28,000 Not Implemented
UD1024 # 02 Y:2020 02 2020 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $44,273 $40,000 Not Implemented
UD1024 # 11 Y:2020 11 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $636 $0 Implemented
UD1024 # 04 Y:2020 04 2020 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $15,421 $0 Not Implemented
UD1024 # 06 Y:2020 06 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $52,582 $24,500 Not Implemented
UD1024 # 03 Y:2020 03 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $37,324 $1,300 Not Implemented
UD0910 # 03 Y:2014 03 2014 RECOVER WASTE HEAT FROM EQUIPMENT $10,400 $10,000 Implemented
UD0910 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,016 $1,000 Not Implemented
UD0910 # 05 Y:2014 05 2014 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $332,549 $400,000 Not Implemented
UD0910 # 06 Y:2014 06 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $19,208 $40,430 Not Implemented
UD0910 # 07 Y:2014 07 2014 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $11,334 $18,902 Implemented
UD0910 # 08 Y:2014 08 2014 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $377,548 $1,083,820 Implemented
UD0910 # 09 Y:2014 09 2014 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $45,862 $9,000 Not Implemented