IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
NAICS 325412 Pharmaceutical Preparation Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0779 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $4,725 $57,101 Not Implemented
OR0779 # 03 Y:2023 03 2023 ADOPT IN-HOUSE MATERIAL GENERATION $43,575 $54,837 Not Implemented
OR0779 # 02 Y:2023 02 2023 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,749 $0 Not Implemented
OR0779 # 01 Y:2023 01 2023 ELIMINATE/REDUCE AN OPERATION $3,315 $0 Not Implemented
OR0670 # 06 Y:2016 06 2016 USE SOLAR HEAT TO MAKE ELECTRICTY $29,141 $269,109 Not Implemented
OR0670 # 05 Y:2016 05 2016 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $8,398 $2,405 Not Implemented
OR0670 # 04 Y:2016 04 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $8,978 $1,314 Implemented
OR0670 # 03 Y:2016 03 2016 INSTALL OCCUPANCY SENSORS $14,066 $10,367 Implemented
OR0670 # 02 Y:2016 02 2016 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $13,371 $5,100 Implemented
OR0670 # 01 Y:2016 01 2016 REDUCE FLUID FLOW RATES $244,946 $880,000 Not Implemented
OR0669 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $4,233 $5,720 Not Implemented
OR0669 # 06 Y:2016 06 2016 USE SOLAR HEAT TO MAKE ELECTRICTY $28,137 $340,762 Not Implemented
OR0669 # 04 Y:2016 04 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,352 $500 Not Implemented
OR0669 # 03 Y:2016 03 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $39,019 $15,722 Not Implemented
OR0669 # 02 Y:2016 02 2016 BURN WASTE OIL FOR HEAT $375,721 $189,945 Not Implemented
OR0669 # 01 Y:2016 01 2016 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,894 $5,100 Not Implemented
OR0541 # 01 Y:2008 01 2008 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $277,000 $77,500 Implemented
OR0541 # 07 Y:2008 07 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $19,386 $49,854 Not Implemented
OR0541 # 06 Y:2008 06 2008 OPTIMIZE PLANT POWER FACTOR $1,170 $5,250 Not Implemented
OR0541 # 05 Y:2008 05 2008 USE SOLAR HEAT TO MAKE ELECTRICTY $18,926 $289,553 Not Implemented
OR0541 # 04 Y:2008 04 2008 UPGRADE CONTROLS ON COMPRESSORS $8,200 $8,200 Not Implemented
OR0541 # 03 Y:2008 03 2008 INSTALL OCCUPANCY SENSORS $10,377 $3,000 Not Implemented
OR0541 # 02 Y:2008 02 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,123 $8,200 Not Implemented