Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsNAICS | 325412 | Pharmaceutical Preparation Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0336 # 01 Y:2006 | 01 | 2006 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $16 | $0 | Implemented |
SF0336 # 13 Y:2006 | 13 | 2006 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $327 | $6,381 | Implemented |
SF0336 # 12 Y:2006 | 12 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,076 | $16,625 | Implemented |
SF0336 # 11 Y:2006 | 11 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $955 | $2,480 | Implemented |
SF0336 # 10 Y:2006 | 10 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $234 | $557 | Implemented |
SF0336 # 09 Y:2006 | 09 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2 | $7,040 | Implemented |
SF0336 # 08 Y:2006 | 08 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $872 | $2,849 | Not Implemented |
SF0336 # 07 Y:2006 | 07 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $883 | $4,374 | Not Implemented |
SF0336 # 06 Y:2006 | 06 | 2006 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $31 | $29,700 | Not Implemented |
SF0336 # 05 Y:2006 | 05 | 2006 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $22,164 | $15,000 | Not Implemented |
SF0336 # 04 Y:2006 | 04 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,827 | $5,934 | Not Implemented |
SF0336 # 03 Y:2006 | 03 | 2006 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $882 | $24,000 | Not Implemented |
SF0336 # 02 Y:2006 | 02 | 2006 | REDUCE VENTILATION AIR | $202 | $0 | Implemented |
LE0237 # 01 Y:2006 | 01 | 2006 | REDESIGN PROCESS | $149,763 | $12,500 | Not Implemented |
LE0237 # 07 Y:2006 | 07 | 2006 | INSTALL OCCUPANCY SENSORS | $3,162 | $900 | Implemented |
LE0237 # 06 Y:2006 | 06 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,658 | $3,000 | Not Implemented |
LE0237 # 05 Y:2006 | 05 | 2006 | ADJUST BURNERS FOR EFFICIENT OPERATION | $3,961 | $200 | Not Implemented |
LE0237 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,057 | $1,000 | Implemented |
LE0237 # 03 Y:2006 | 03 | 2006 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $64,774 | $2,000 | Implemented |
LE0237 # 02 Y:2006 | 02 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $89,692 | $7,500 | Not Implemented |
NC0332 # 05 Y:2006 | 05 | 2006 | INSULATE BARE EQUIPMENT | $406 | $86 | Not Implemented |
NC0332 # 04 Y:2006 | 04 | 2006 | INSULATE FEEDWATER TANK | $389 | $277 | Not Implemented |
NC0332 # 03 Y:2006 | 03 | 2006 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $17,210 | $28,200 | Not Implemented |
NC0332 # 02 Y:2006 | 02 | 2006 | MAKE ICE DURING OFF PEAK HOURS FOR COOLING | $39,950 | $210,000 | Not Implemented |
NC0332 # 01 Y:2006 | 01 | 2006 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $20,455 | $12,000 | Not Implemented |