IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

147

matching recommendations
Reset
NAICS 325414 Biological Product (except Diagnostic) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0411 # 08 Y:2007 08 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,675 $33 Implemented
UU0074 # 01 Y:2004 01 2004 RECOVER WASTE HEAT FROM EQUIPMENT $29,620 $45,000 Not Implemented
UU0074 # 02 Y:2004 02 2004 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $6,200 $17,000 Not Implemented
UU0074 # 03 Y:2004 03 2004 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,750 $5,000 Not Implemented
UU0074 # 04 Y:2004 04 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,620 $4 Not Implemented
UU0074 # 05 Y:2004 05 2004 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $19,210 $25 Not Implemented
UU0074 # 06 Y:2004 06 2004 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,570 $12 Implemented
WI0459 # 01 Y:2004 01 2004 USE OPTIMUM TEMPERATURE $17,598 $4,500 Not Implemented
WI0459 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,519 $26,871 n/a
WI0459 # 03 Y:2004 03 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $11,712 $11,250 n/a
WI0459 # 04 Y:2004 04 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $340 $640 Implemented
WI0459 # 05 Y:2004 05 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $323 $1,206 Not Implemented
CO0521 # 01 Y:2003 01 2003 UTILIZE A LESS EXPENSIVE COOLING METHOD $65,190 $82,000 Not Implemented
CO0521 # 02 Y:2003 02 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,840 $5,100 Not Implemented
CO0521 # 03 Y:2003 03 2003 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,010 $1,400 Implemented
CO0521 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,000 $200 Implemented
CO0521 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,650 $3,532 Not Implemented
CO0521 # 06 Y:2003 06 2003 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $48,290 $175,000 Not Implemented
MA0528 # 01 Y:2003 01 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $18,973 $48,190 Not Implemented
MA0528 # 02 Y:2003 02 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $9,180 $16,000 Not Implemented
MA0528 # 03 Y:2003 03 2003 RECOVER WASTE HEAT FROM EQUIPMENT $7,167 $9,862 Not Implemented
MA0528 # 04 Y:2003 04 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,752 $0 Implemented
MA0528 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $2,103 $1,325 Implemented
AM0431 # 01 Y:2003 01 2003 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $23,400 $240 Implemented
AM0431 # 02 Y:2003 02 2003 OPTIMIZE PLANT POWER FACTOR $5,030 $11,900 Not Implemented