Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
46
matching recommendationsNAICS | 325414 | Biological Product (except Diagnostic) Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0074 # 06 Y:2004 | 06 | 2004 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,570 | $12 | Implemented |
UU0074 # 01 Y:2004 | 01 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $29,620 | $45,000 | Not Implemented |
UU0074 # 05 Y:2004 | 05 | 2004 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $19,210 | $25 | Not Implemented |
UU0074 # 04 Y:2004 | 04 | 2004 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,620 | $4 | Not Implemented |
UU0074 # 03 Y:2004 | 03 | 2004 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,750 | $5,000 | Not Implemented |
UU0074 # 02 Y:2004 | 02 | 2004 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $6,200 | $17,000 | Not Implemented |
WI0459 # 03 Y:2004 | 03 | 2004 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $11,712 | $11,250 | n/a |
WI0459 # 02 Y:2004 | 02 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,519 | $26,871 | n/a |
WI0459 # 05 Y:2004 | 05 | 2004 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $323 | $1,206 | Not Implemented |
WI0459 # 01 Y:2004 | 01 | 2004 | USE OPTIMUM TEMPERATURE | $17,598 | $4,500 | Not Implemented |
WI0459 # 04 Y:2004 | 04 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $340 | $640 | Implemented |
CO0521 # 01 Y:2003 | 01 | 2003 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $65,190 | $82,000 | Not Implemented |
CO0521 # 02 Y:2003 | 02 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,840 | $5,100 | Not Implemented |
CO0521 # 03 Y:2003 | 03 | 2003 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $2,010 | $1,400 | Implemented |
CO0521 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,000 | $200 | Implemented |
CO0521 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,650 | $3,532 | Not Implemented |
CO0521 # 06 Y:2003 | 06 | 2003 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $48,290 | $175,000 | Not Implemented |
MA0528 # 02 Y:2003 | 02 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $9,180 | $16,000 | Not Implemented |
MA0528 # 01 Y:2003 | 01 | 2003 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $18,973 | $48,190 | Not Implemented |
MA0528 # 03 Y:2003 | 03 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,167 | $9,862 | Not Implemented |
MA0528 # 05 Y:2003 | 05 | 2003 | INSTALL OCCUPANCY SENSORS | $2,103 | $1,325 | Implemented |
MA0528 # 04 Y:2003 | 04 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,752 | $0 | Implemented |
AM0431 # 08 Y:2003 | 08 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,150 | $0 | Implemented |
AM0431 # 06 Y:2003 | 06 | 2003 | REDUCE HEAT GAIN BY WINDOW TINTING | $1,720 | $4,460 | Not Implemented |
AM0431 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,460 | $1,790 | Implemented |