Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
399
matching recommendationsNAICS | 325510 | Paint and Coating Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MU0015 # 01 Y:2022 | 01 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $165 | $108 | Implemented |
MU0015 # 03 Y:2022 | 03 | 2022 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,649 | $5,520 | Not Implemented |
MU0015 # 05 Y:2022 | 05 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,565 | $40,300 | Implemented |
MU0015 # 06 Y:2022 | 06 | 2022 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $127 | $104 | Implemented |
MU0015 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,511 | $160 | Implemented |
MU0015 # 07 Y:2022 | 07 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,257 | $5,281 | Implemented |
MU0015 # 08 Y:2022 | 08 | 2022 | KEEP EQUIPMENT CLEAN | $13 | $0 | Implemented |
UL2209 # 03 Y:2022 | 03 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $18,922 | $259,874 | Not Implemented |
MU0015 # 02 Y:2022 | 02 | 2022 | INSTALL OCCUPANCY SENSORS | $125 | $343 | Implemented |
UL2209 # 04 Y:2022 | 04 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $106,250 | $1,192,362 | Not Implemented |
UL2209 # 06 Y:2022 | 06 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,998 | $29,151 | Not Implemented |
UL2209 # 02 Y:2022 | 02 | 2022 | OPTIMIZE PLANT POWER FACTOR | $129,982 | $118,199 | Not Implemented |
UL2209 # 05 Y:2022 | 05 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $48,414 | $30,522 | Not Implemented |
UL2209 # 01 Y:2022 | 01 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,491 | $0 | Not Implemented |
MA0820 # 05 Y:2020 | 05 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $204 | $200 | Implemented |
MA0820 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,862 | $11,220 | Not Implemented |
MA0820 # 01 Y:2020 | 01 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $30,760 | $129,192 | Not Implemented |
MA0820 # 03 Y:2020 | 03 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,673 | $7,900 | Not Implemented |
MA0820 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $723 | $300 | Implemented |
WV0579 # 04 Y:2019 | 04 | 2019 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $8,774 | $22,038 | Not Implemented |
WV0579 # 10 Y:2019 | 10 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $346 | $33 | Implemented |
WV0579 # 01 Y:2019 | 01 | 2019 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $95,486 | $76,000 | Not Implemented |
WV0579 # 02 Y:2019 | 02 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $18,379 | $3,500 | Implemented |
WV0579 # 06 Y:2019 | 06 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,976 | $11,825 | Not Implemented |
WV0579 # 03 Y:2019 | 03 | 2019 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $14,452 | $10,325 | Not Implemented |