IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

152

matching recommendations
Reset
NAICS 32552 Adhesive Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0678 # 08 Y:2025 08 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,842 $11,112 Implemented
WV0678 # 17 Y:2025 17 2025 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,209 $3,002 Implemented
WV0678 # 15 Y:2025 15 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,433 $11,061 Implemented
WV0678 # 16 Y:2025 16 2025 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,980 $304 Implemented
WV0678 # 18 Y:2025 18 2025 INSULATE BARE EQUIPMENT $664 $914 Implemented
WV0678 # 06 Y:2025 06 2025 PREHEAT COMBUSTION AIR WITH WASTE HEAT $5,185 $11,425 Implemented
WV0678 # 04 Y:2025 04 2025 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $12,735 $5,200 Implemented
WV0678 # 09 Y:2025 09 2025 INSTALL OCCUPANCY SENSORS $4,772 $4,323 Implemented
WV0678 # 14 Y:2025 14 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,031 $684 Implemented
WV0678 # 19 Y:2025 19 2025 REDUCE VENTILATION AIR $631 $2,400 Implemented
WV0678 # 13 Y:2025 13 2025 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $3,130 $2,676 Implemented
WV0678 # 12 Y:2025 12 2025 DEVELOP A REPAIR/REPLACE POLICY $4,059 $1,304 Implemented
WV0678 # 07 Y:2025 07 2025 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,003 $3,121 Implemented
NL0088 # 03 Y:2023 03 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,828 $160 Implemented
NL0088 # 05 Y:2023 05 2023 MINIMIZE WATER USAGE $311 $230 Implemented
NL0088 # 04 Y:2023 04 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $988 $40 Implemented
NL0088 # 02 Y:2023 02 2023 METER WASTE WATER $4,109 $320 Implemented
NL0088 # 06 Y:2023 06 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $92 $80 Implemented
LE0529 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,841 $6,763 Implemented
LE0529 # 03 Y:2022 03 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $20,316 $89,649 Implemented
LE0529 # 04 Y:2022 04 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $118,441 $791,800 Implemented
UD1027 # 01 Y:2021 01 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,612 $0 Implemented
UD1027 # 05 Y:2021 05 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,842 $1,000 Implemented
UD1027 # 09 Y:2021 09 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,013 $65,250 Implemented
IP0135 # 05 Y:2020 05 2020 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,568 $390 Implemented