IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

134

matching recommendations
Reset
NAICS 32552 Adhesive Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0529 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,841 $6,763 Implemented
LE0529 # 04 Y:2022 04 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $118,441 $791,800 Implemented
LE0529 # 03 Y:2022 03 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $20,316 $89,649 Implemented
UD1027 # 09 Y:2021 09 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,013 $65,250 Implemented
UD1027 # 05 Y:2021 05 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,842 $1,000 Implemented
UD1027 # 01 Y:2021 01 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,612 $0 Implemented
IP0135 # 12 Y:2020 12 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,916 $6,013 Implemented
IP0135 # 09 Y:2020 09 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,937 $3,800 Implemented
IP0135 # 07 Y:2020 07 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $957 $588 Implemented
IP0135 # 06 Y:2020 06 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,626 $1,418 Implemented
IP0135 # 05 Y:2020 05 2020 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,568 $390 Implemented
IP0135 # 03 Y:2020 03 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $317 $0 Implemented
IP0135 # 01 Y:2020 01 2020 COMBINE UTILITY METERS $2,157 $0 Implemented
MI0369 # 01 Y:2020 01 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $11,259 $580 Implemented
MI0369 # 02 Y:2020 02 2020 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $6,954 $7,492 Implemented
MI0369 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,267 $1,980 Implemented
MZ0258 # 04 Y:2018 04 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,728 $3,200 Implemented
MZ0258 # 02 Y:2018 02 2018 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $17,450 $5,000 Implemented
MZ0258 # 06 Y:2018 06 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,344 $1,800 Implemented
NC0617 # 06 Y:2018 06 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,162 $50,000 Implemented
NC0617 # 02 Y:2018 02 2018 USE PHOTOCELL CONTROLS $1,341 $450 Implemented
NC0617 # 04 Y:2018 04 2018 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,137 $12,000 Implemented
NC0617 # 03 Y:2018 03 2018 INSTALL / REPAIR INSULATION ON STEAM LINES $352 $90 Implemented
NC0617 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,647 $16,472 Implemented
AM0748 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,300 $51,700 Implemented