Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
134
matching recommendationsNAICS | 32552 | Adhesive Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0078 # 02 Y:2017 | 02 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,032 | $21 | Implemented |
IP0078 # 04 Y:2017 | 04 | 2017 | INSTALL OCCUPANCY SENSORS | $1,354 | $3,396 | Implemented |
MA0762 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $65,741 | $161,899 | Implemented |
MA0762 # 03 Y:2016 | 03 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $52,257 | $19,975 | Implemented |
MA0762 # 04 Y:2016 | 04 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $49,046 | $65,000 | Implemented |
MA0762 # 05 Y:2016 | 05 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $47,587 | $19,980 | Implemented |
MA0762 # 06 Y:2016 | 06 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,640 | $13,585 | Implemented |
WM0084 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,124 | $83,912 | Implemented |
WM0084 # 05 Y:2016 | 05 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,605 | $1,900 | Implemented |
WM0084 # 06 Y:2016 | 06 | 2016 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,665 | $0 | Implemented |
WM0084 # 08 Y:2016 | 08 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,103 | $400 | Implemented |
WM0084 # 11 Y:2016 | 11 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,465 | $0 | Implemented |
WM0084 # 12 Y:2016 | 12 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $866 | $1,988 | Implemented |
WV0521 # 02 Y:2016 | 02 | 2016 | UPGRADE CONTROLS ON COMPRESSORS | $10,186 | $8,000 | Implemented |
WV0521 # 04 Y:2016 | 04 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,142 | $152 | Implemented |
WV0521 # 07 Y:2016 | 07 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $728 | $443 | Implemented |
WV0521 # 08 Y:2016 | 08 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $718 | $500 | Implemented |
LE0409 # 01 Y:2016 | 01 | 2016 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $591 | $0 | Implemented |
LE0409 # 02 Y:2016 | 02 | 2016 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $2,416 | $2,000 | Implemented |
LE0409 # 03 Y:2016 | 03 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,598 | $5,700 | Implemented |
LE0409 # 05 Y:2016 | 05 | 2016 | USE RADIANT HEATER FOR SPOT HEATING | $6,148 | $21,000 | Implemented |
SF0475 # 01 Y:2015 | 01 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,033 | $0 | Implemented |
SF0475 # 02 Y:2015 | 02 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,039 | $0 | Implemented |
SF0475 # 03 Y:2015 | 03 | 2015 | INSULATE BARE EQUIPMENT | $2,990 | $822 | Implemented |
SF0475 # 04 Y:2015 | 04 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $496 | $1,340 | Implemented |