Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
582
matching recommendationsNAICS | 3256 | Soap, Cleaning Compound, and Toilet Preparation Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0438 # 05 Y:2017 | 05 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,106 | $13,000 | Not Implemented |
LE0438 # 06 Y:2017 | 06 | 2017 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $185,116 | $366,000 | Implemented |
LE0438 # 07 Y:2017 | 07 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,862 | $19,575 | Not Implemented |
LE0438 # 08 Y:2017 | 08 | 2017 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $19,166 | $53,000 | Not Implemented |
LE0438 # 09 Y:2017 | 09 | 2017 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $9,816 | $47,000 | Not Implemented |
MZ0228 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $20,062 | $0 | Implemented |
MZ0228 # 02 Y:2017 | 02 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,002 | $1,080 | Implemented |
MZ0228 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,092 | $1,772 | Implemented |
MZ0228 # 04 Y:2017 | 04 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,423 | $280 | Implemented |
MZ0228 # 05 Y:2017 | 05 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $897 | $340 | Implemented |
MZ0228 # 06 Y:2017 | 06 | 2017 | USE OPTIMUM THICKNESS INSULATION | $625 | $651 | Not Implemented |
UM0482 # 01 Y:2017 | 01 | 2017 | INSTALL OCCUPANCY SENSORS | $26,386 | $13,350 | n/a |
UM0482 # 02 Y:2017 | 02 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,148 | $2,000 | n/a |
UM0482 # 03 Y:2017 | 03 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,675 | $3,000 | n/a |
UM0482 # 04 Y:2017 | 04 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,040 | $390 | n/a |
SD0533 # 01 Y:2016 | 01 | 2016 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $65,643 | $292,000 | Not Implemented |
SD0533 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,187 | $25,315 | Implemented |
SD0533 # 03 Y:2016 | 03 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $11,672 | $7,800 | Implemented |
SD0533 # 04 Y:2016 | 04 | 2016 | OPTIMIZE PLANT POWER FACTOR | $4,856 | $2,339 | Not Implemented |
SD0533 # 05 Y:2016 | 05 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,056 | $1,000 | Implemented |
SD0533 # 06 Y:2016 | 06 | 2016 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $2,827 | $5,600 | Not Implemented |
SD0533 # 07 Y:2016 | 07 | 2016 | USE PHOTOCELL CONTROLS | $2,169 | $3,700 | Implemented |
UK1603 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $89,730 | $85,358 | Implemented |
UK1603 # 02 Y:2016 | 02 | 2016 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $3,306 | $1,445 | Not Implemented |
UK1603 # 03 Y:2016 | 03 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $18,272 | $35,000 | Implemented |