Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
582
matching recommendationsNAICS | 3256 | Soap, Cleaning Compound, and Toilet Preparation Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0432 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $682 | $1,953 | Implemented |
MI0432 # 08 Y:2023 | 08 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $678 | $490 | Not Implemented |
MI0432 # 09 Y:2023 | 09 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $276 | $1,150 | Not Implemented |
UU0230 # 11 Y:2023 | 11 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,121 | $33,692 | Not Implemented |
UU0230 # 10 Y:2023 | 10 | 2023 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,460 | $1,000 | Implemented |
UU0230 # 09 Y:2023 | 09 | 2023 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,682 | $2,000 | Not Implemented |
UU0230 # 08 Y:2023 | 08 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $9,790 | $1,000 | Implemented |
UU0230 # 07 Y:2023 | 07 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $32,123 | $20,174 | Implemented |
UU0230 # 06 Y:2023 | 06 | 2023 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $7,985 | $11,730 | Not Implemented |
UU0230 # 05 Y:2023 | 05 | 2023 | INSULATE BARE EQUIPMENT | $4,607 | $4,819 | Implemented |
UU0230 # 04 Y:2023 | 04 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,277 | $2,970 | Implemented |
UU0230 # 03 Y:2023 | 03 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,861 | $1,200 | Implemented |
UU0230 # 02 Y:2023 | 02 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $8,818 | $12,930 | Implemented |
UU0230 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,018 | $26,647 | Implemented |
UF0598 # 11 Y:2023 | 11 | 2023 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $3,193 | $15,120 | Not Implemented |
UF0598 # 10 Y:2023 | 10 | 2023 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $5,588 | $2,800 | Implemented |
UF0598 # 09 Y:2023 | 09 | 2023 | INSTALL TURBULATORS | $6,732 | $7,500 | Implemented |
UF0598 # 08 Y:2023 | 08 | 2023 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $8,114 | $0 | Implemented |
UF0598 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,338 | $432 | Implemented |
UF0598 # 06 Y:2023 | 06 | 2023 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $10,556 | $22,000 | Implemented |
UF0598 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,433 | $14,328 | Implemented |
UF0598 # 04 Y:2023 | 04 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $26,906 | $25,280 | Not Implemented |
UF0598 # 03 Y:2023 | 03 | 2023 | USE BATTERY STORAGE FOR DEMAND CONTROL | $30,832 | $8,310 | Implemented |
UF0598 # 02 Y:2023 | 02 | 2023 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $61,221 | $34,460 | Implemented |
UF0598 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $94,792 | $289,896 | Not Implemented |