IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

357

matching recommendations
Reset
NAICS 32561 Soap and Cleaning Compound Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0521 # 07 Y:2007 07 2007 INSTALL SKYLIGHTS $3,000 $3,320 Not Implemented
AM0521 # 08 Y:2007 08 2007 PAY UTILITY BILLS ON TIME $2,066 $0 Implemented
AM0521 # 09 Y:2007 09 2007 INSULATE BARE EQUIPMENT $1,200 $45 Not Implemented
AM0521 # 10 Y:2007 10 2007 OPTIMIZE PLANT POWER FACTOR $900 $1,620 Not Implemented
AM0521 # 11 Y:2007 11 2007 INSULATE BARE EQUIPMENT $180 $150 Not Implemented
UD0736 # 01 Y:2006 01 2006 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $511,635 $1,058,400 Not Implemented
UD0736 # 16 Y:2006 16 2006 REPAIR AND ELIMINATE STEAM LEAKS $1,390 $2,800 Not Implemented
UD0736 # 15 Y:2006 15 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,790 $0 Not Implemented
UD0736 # 14 Y:2006 14 2006 UPGRADE CONTROLS ON COMPRESSORS $4,542 $0 Not Implemented
UD0736 # 13 Y:2006 13 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,098 $0 Implemented
UD0736 # 12 Y:2006 12 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,612 $26,000 Implemented
UD0736 # 10 Y:2006 10 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,947 $15,000 Not Implemented
UD0736 # 02 Y:2006 02 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $151,099 $230,000 Implemented
UD0736 # 03 Y:2006 03 2006 REPAIR AND ELIMINATE STEAM LEAKS $36,074 $28,000 Implemented
UD0736 # 04 Y:2006 04 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $35,184 $14,041 Implemented
UD0736 # 05 Y:2006 05 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $32,384 $28,000 Implemented
UD0736 # 06 Y:2006 06 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $29,264 $40,000 Implemented
UD0736 # 07 Y:2006 07 2006 INSULATE BARE EQUIPMENT $14,596 $6,878 Not Implemented
UD0736 # 08 Y:2006 08 2006 INSULATE FEEDWATER TANK $12,187 $6,825 Implemented
UD0736 # 09 Y:2006 09 2006 REPAIR OR REPLACE STEAM TRAPS $11,892 $240 Implemented
UD0736 # 11 Y:2006 11 2006 TREAT AND REUSE RINSE WATERS $9,788 $10,000 Not Implemented
LE0218 # 01 Y:2005 01 2005 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $39,290 $600 Not Implemented
LE0218 # 02 Y:2005 02 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,740 $3,000 Not Implemented
LE0218 # 03 Y:2005 03 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,249 $1,250 Not Implemented
LE0218 # 04 Y:2005 04 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,565 $480 Not Implemented