IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

211

matching recommendations
Reset
NAICS 325611 Soap and Other Detergent Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0934 # 06 Y:2015 06 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $25,672 $18,125 Not Implemented
UD0934 # 07 Y:2015 07 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,363 $2,700 Not Implemented
UD0934 # 08 Y:2015 08 2015 REDUCE VENTILATION AIR $11,488 $18,984 Not Implemented
UD0934 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,944 $75,059 Implemented
UD0934 # 10 Y:2015 10 2015 INSTALL OCCUPANCY SENSORS $1,058 $330 Implemented
UD0921 # 01 Y:2015 01 2015 REDUCE VENTILATION AIR $16,159 $0 Implemented
UD0921 # 02 Y:2015 02 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $405 $0 Implemented
UD0921 # 03 Y:2015 03 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $723 $0 Not Implemented
UD0921 # 04 Y:2015 04 2015 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $381 $275 Implemented
UD0921 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,887 $950 Implemented
UD0921 # 06 Y:2015 06 2015 RECOVER WASTE HEAT FROM EQUIPMENT $1,838 $1,250 Not Implemented
UD0921 # 07 Y:2015 07 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,470 $1,000 Not Implemented
UD0921 # 08 Y:2015 08 2015 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,618 $700 Not Implemented
UD0921 # 09 Y:2015 09 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,190 $4,300 Not Implemented
UD0921 # 10 Y:2015 10 2015 INSULATE BARE EQUIPMENT $3,379 $8,000 Implemented
UD0921 # 11 Y:2015 11 2015 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,030 $6,052 Not Implemented
UD0921 # 12 Y:2015 12 2015 CLEAN FOULING FROM WATER LINES REGULARLY $4,725 $11,000 Not Implemented
LE0388 # 01 Y:2015 01 2015 RECOVER WASTE HEAT FROM EQUIPMENT $2,857 $1,520 Implemented
LE0388 # 02 Y:2015 02 2015 USE RADIANT HEATER FOR SPOT HEATING $11,147 $21,250 Not Implemented
LE0388 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $510 $1,000 Implemented
LE0388 # 04 Y:2015 04 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,556 $3,052 Not Implemented
LE0388 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,333 $20,147 Implemented
LE0388 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,432 $16,500 Not Implemented
LE0388 # 07 Y:2015 07 2015 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,735 $9,703 Not Implemented
LE0388 # 08 Y:2015 08 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $272 $1,200 Implemented