Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
89
matching recommendationsNAICS | 325612 | Polish and Other Sanitation Good Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0678 # 03 Y:2015 | 03 | 2015 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,300 | $0 | Implemented |
AM0678 # 04 Y:2015 | 04 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $520 | $30 | Not Implemented |
AM0678 # 05 Y:2015 | 05 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $365 | $200 | Implemented |
UD0760 # 09 Y:2007 | 09 | 2007 | USE PHOTOCELL CONTROLS | $517 | $105 | Not Implemented |
UD0760 # 08 Y:2007 | 08 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $563 | $48 | Implemented |
UD0760 # 07 Y:2007 | 07 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,153 | $2,634 | Not Implemented |
UD0760 # 06 Y:2007 | 06 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,886 | $6,000 | Implemented |
UD0760 # 05 Y:2007 | 05 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,006 | $1,250 | Implemented |
UD0760 # 04 Y:2007 | 04 | 2007 | DEVELOP A REPAIR/REPLACE POLICY | $3,677 | $13,959 | Implemented |
UD0760 # 03 Y:2007 | 03 | 2007 | INSULATE BARE EQUIPMENT | $4,030 | $2,760 | Implemented |
UD0760 # 02 Y:2007 | 02 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,480 | $0 | Implemented |
UD0760 # 01 Y:2007 | 01 | 2007 | INSULATE BARE EQUIPMENT | $10,167 | $6 | Implemented |
LE0218 # 05 Y:2005 | 05 | 2005 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $3,530 | $480 | Not Implemented |
LE0218 # 06 Y:2005 | 06 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,038 | $1,200 | Not Implemented |
LE0218 # 04 Y:2005 | 04 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,565 | $480 | Not Implemented |
LE0218 # 03 Y:2005 | 03 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,249 | $1,250 | Not Implemented |
LE0218 # 02 Y:2005 | 02 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,740 | $3,000 | Not Implemented |
LE0218 # 01 Y:2005 | 01 | 2005 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $39,290 | $600 | Not Implemented |
WI0464 # 08 Y:2004 | 08 | 2004 | INSTALL OCCUPANCY SENSORS | $149 | $149 | Not Implemented |
WI0464 # 07 Y:2004 | 07 | 2004 | INSTALL AUTOMATIC STACK DAMPER | $409 | $1,800 | Not Implemented |
WI0464 # 06 Y:2004 | 06 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $468 | $0 | Not Implemented |
WI0464 # 05 Y:2004 | 05 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,256 | $428 | Not Implemented |
WI0464 # 04 Y:2004 | 04 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,860 | $1,000 | Implemented |
WI0464 # 03 Y:2004 | 03 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,856 | $0 | Implemented |
WI0464 # 02 Y:2004 | 02 | 2004 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $3,969 | $6,500 | Not Implemented |