IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

225

matching recommendations
Reset
NAICS 32562 Toilet Preparation Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0113 # 05 Y:2019 05 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $629 $0 Not Implemented
IP0113 # 06 Y:2019 06 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,196 $72 Implemented
IP0113 # 07 Y:2019 07 2019 USE PHOTOCELL CONTROLS $151 $71 Implemented
IP0113 # 08 Y:2019 08 2019 INSTALL OCCUPANCY SENSORS $591 $501 Implemented
IP0113 # 09 Y:2019 09 2019 OPTIMIZE PLANT POWER FACTOR $1,564 $876 Not Implemented
IP0113 # 10 Y:2019 10 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $775 $765 Not Implemented
IP0113 # 11 Y:2019 11 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $476 $1,343 Implemented
IP0113 # 12 Y:2019 12 2019 RECOVER WASTE HEAT FROM EQUIPMENT $892 $2,129 Not Implemented
IP0113 # 13 Y:2019 13 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,555 $21,000 Not Implemented
TT0204 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $94,373 $226,854 Implemented
TT0204 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,716 $10,000 Implemented
TT0204 # 03 Y:2018 03 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,154 $0 Implemented
TT0204 # 04 Y:2018 04 2018 OPTIMIZE PLANT POWER FACTOR $4,922 $20,000 Implemented
TT0204 # 05 Y:2018 05 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,633 $3,000 Implemented
TT0204 # 06 Y:2018 06 2018 MINIMIZE WATER USAGE $3,724 $5,000 Implemented
TT0204 # 07 Y:2018 07 2018 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $968 $0 Implemented
TT0204 # 08 Y:2018 08 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $637 $675 Implemented
TT0204 # 09 Y:2018 09 2018 INSTALL TIMERS AND/OR THERMOSTATS $402 $0 Implemented
SD0533 # 01 Y:2016 01 2016 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $65,643 $292,000 Not Implemented
SD0533 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,187 $25,315 Implemented
SD0533 # 03 Y:2016 03 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $11,672 $7,800 Implemented
SD0533 # 04 Y:2016 04 2016 OPTIMIZE PLANT POWER FACTOR $4,856 $2,339 Not Implemented
SD0533 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,056 $1,000 Implemented
SD0533 # 06 Y:2016 06 2016 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,827 $5,600 Not Implemented
SD0533 # 07 Y:2016 07 2016 USE PHOTOCELL CONTROLS $2,169 $3,700 Implemented