Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
63
matching recommendationsNAICS | 3259 | Other Chemical Product and Preparation Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0309 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $30,407 | $4,800 | Not Implemented |
TT0309 # 10 Y:2024 | 10 | 2024 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $2,373 | $430 | Not Implemented |
TT0309 # 08 Y:2024 | 08 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,336 | $20,480 | Not Implemented |
TT0309 # 07 Y:2024 | 07 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $10,333 | $0 | Not Implemented |
TT0309 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,028 | $1,500 | Not Implemented |
TT0309 # 05 Y:2024 | 05 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $16,687 | $0 | Not Implemented |
TT0309 # 04 Y:2024 | 04 | 2024 | REPLACE BOILER | $18,200 | $104,000 | Not Implemented |
TT0309 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,893 | $157,700 | Not Implemented |
TT0309 # 09 Y:2024 | 09 | 2024 | METER WASTE WATER | $4,799 | $1,100 | Not Implemented |
TT0309 # 01 Y:2024 | 01 | 2024 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $83,523 | $250,000 | Not Implemented |
TT0294 # 05 Y:2023 | 05 | 2023 | AIR CONDITION ONLY SPACE NECESSARY | $6,563 | $18,000 | Not Implemented |
TT0294 # 06 Y:2023 | 06 | 2023 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $4,671 | $500 | Implemented |
TT0294 # 10 Y:2023 | 10 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $974 | $500 | Implemented |
TT0294 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,950 | $3,100 | Implemented |
TT0294 # 03 Y:2023 | 03 | 2023 | PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT | $14,815 | $12,000 | Implemented |
TT0294 # 07 Y:2023 | 07 | 2023 | USE SOLAR HEAT FOR HEAT | $4,761 | $15,950 | Not Implemented |
TT0294 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,944 | $43,883 | Implemented |
TT0294 # 01 Y:2023 | 01 | 2023 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $77,940 | $2,000 | Implemented |
TT0294 # 08 Y:2023 | 08 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,236 | $7,500 | Implemented |
TT0294 # 09 Y:2023 | 09 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,938 | $40 | Not Implemented |
TT0294 # 11 Y:2023 | 11 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $88 | $100 | Implemented |
TT0289 # 06 Y:2023 | 06 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $61,137 | $119,000 | Implemented |
TT0289 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,719 | $1,609 | Not Implemented |
TT0289 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,365 | $1,405 | Implemented |
TT0289 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,836 | $40 | Implemented |