Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
49
matching recommendationsNAICS | 32591 | Printing Ink Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0973 # 01 Y:2024 | 01 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $7,645 | $800 | Implemented |
GT0973 # 02 Y:2024 | 02 | 2024 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $394 | $90 | Implemented |
GT0973 # 03 Y:2024 | 03 | 2024 | PAY UTILITY BILLS ON TIME | $689 | $200 | Not Implemented |
GT0973 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $305 | $200 | Implemented |
GT0973 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,586 | $1,850 | Implemented |
GT0973 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $25,481 | $338,242 | Not Implemented |
GT0973 # 07 Y:2024 | 07 | 2024 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $27,850 | $175,000 | Not Implemented |
IP0178 # 04 Y:2023 | 04 | 2023 | REPLACE BOILER | $5,185 | $20,824 | Not Implemented |
IP0178 # 01 Y:2023 | 01 | 2023 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,915 | $824 | Not Implemented |
IP0178 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,293 | $2,142 | Not Implemented |
IP0178 # 03 Y:2023 | 03 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,674 | $4,752 | Not Implemented |
UL2311 # 09 Y:2023 | 09 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $83,941 | $859,381 | Not Implemented |
UL2311 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,819 | $13,218 | Implemented |
UL2311 # 02 Y:2023 | 02 | 2023 | INSTALL OCCUPANCY SENSORS | $2,078 | $2,711 | Not Implemented |
UL2311 # 03 Y:2023 | 03 | 2023 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $4,286 | $1,600 | Implemented |
UL2311 # 04 Y:2023 | 04 | 2023 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,735 | $0 | Not Implemented |
UL2311 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,230 | $1,980 | Implemented |
UL2311 # 06 Y:2023 | 06 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $22,148 | $29,250 | Not Implemented |
UL2311 # 07 Y:2023 | 07 | 2023 | REPAIR AND ELIMINATE STEAM LEAKS | $3,418 | $1,000 | Implemented |
UL2311 # 08 Y:2023 | 08 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,714 | $9,750 | Not Implemented |
UD1064 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,630 | $32,000 | Not Implemented |
UD1064 # 05 Y:2023 | 05 | 2023 | RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS | $1,632 | $0 | Not Implemented |
UD1064 # 04 Y:2023 | 04 | 2023 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $914 | $4,215 | Not Implemented |
UD1064 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,422 | $13,970 | Not Implemented |
UD1064 # 02 Y:2023 | 02 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $754 | $0 | Not Implemented |