IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49

matching recommendations
Reset
NAICS 325910 Printing Ink Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0973 # 01 Y:2024 01 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $7,645 $800 Implemented
GT0973 # 02 Y:2024 02 2024 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $394 $90 Implemented
GT0973 # 03 Y:2024 03 2024 PAY UTILITY BILLS ON TIME $689 $200 Not Implemented
GT0973 # 04 Y:2024 04 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $305 $200 Implemented
GT0973 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,586 $1,850 Implemented
GT0973 # 06 Y:2024 06 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $25,481 $338,242 Not Implemented
GT0973 # 07 Y:2024 07 2024 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $27,850 $175,000 Not Implemented
IP0178 # 04 Y:2023 04 2023 REPLACE BOILER $5,185 $20,824 Not Implemented
IP0178 # 01 Y:2023 01 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,915 $824 Not Implemented
IP0178 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,293 $2,142 Not Implemented
IP0178 # 03 Y:2023 03 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,674 $4,752 Not Implemented
UL2311 # 09 Y:2023 09 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $83,941 $859,381 Not Implemented
UL2311 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,819 $13,218 Implemented
UL2311 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $2,078 $2,711 Not Implemented
UL2311 # 03 Y:2023 03 2023 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $4,286 $1,600 Implemented
UL2311 # 04 Y:2023 04 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,735 $0 Not Implemented
UL2311 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,230 $1,980 Implemented
UL2311 # 06 Y:2023 06 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $22,148 $29,250 Not Implemented
UL2311 # 07 Y:2023 07 2023 REPAIR AND ELIMINATE STEAM LEAKS $3,418 $1,000 Implemented
UL2311 # 08 Y:2023 08 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,714 $9,750 Not Implemented
UD1064 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,630 $32,000 Not Implemented
UD1064 # 05 Y:2023 05 2023 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $1,632 $0 Not Implemented
UD1064 # 04 Y:2023 04 2023 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $914 $4,215 Not Implemented
UD1064 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,422 $13,970 Not Implemented
UD1064 # 02 Y:2023 02 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $754 $0 Not Implemented