Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20
matching recommendationsNAICS | 32599 | All Other Chemical Product and Preparation Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0512 # 05 Y:2021 | 05 | 2021 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $2,005 | $650 | Not Implemented |
AS0512 # 04 Y:2021 | 04 | 2021 | KEEP EQUIPMENT CLEAN | $3,083 | $3,482 | Not Implemented |
AS0512 # 03 Y:2021 | 03 | 2021 | INSTALL SKYLIGHTS | $3,915 | $15,962 | Not Implemented |
AS0512 # 02 Y:2021 | 02 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,545 | $9,764 | Not Implemented |
AS0512 # 01 Y:2021 | 01 | 2021 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $131,005 | $500 | Implemented |
AS0489 # 05 Y:2020 | 05 | 2020 | REDUCE HEAT GAIN BY WINDOW TINTING | $5,105 | $19,291 | Not Implemented |
AS0489 # 09 Y:2020 | 09 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $106 | $394 | Not Implemented |
AS0489 # 08 Y:2020 | 08 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $675 | $122 | Implemented |
AS0489 # 07 Y:2020 | 07 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $805 | $135 | Not Implemented |
AS0489 # 06 Y:2020 | 06 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,216 | $30 | Not Implemented |
AS0489 # 04 Y:2020 | 04 | 2020 | INSTALL OCCUPANCY SENSORS | $6,004 | $7,027 | Not Implemented |
AS0489 # 03 Y:2020 | 03 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,899 | $28,466 | Not Implemented |
AS0489 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,308 | $21,823 | Not Implemented |
AS0489 # 01 Y:2020 | 01 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,774 | $11,876 | Not Implemented |
AS0415 # 01 Y:2006 | 01 | 2006 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $19,739 | $5,500 | Implemented |
AS0415 # 06 Y:2006 | 06 | 2006 | USE SOLAR HEAT TO HEAT WATER | $132 | $2,800 | Not Implemented |
AS0415 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $810 | $12,174 | Not Implemented |
AS0415 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $928 | $3,000 | Not Implemented |
AS0415 # 03 Y:2006 | 03 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,372 | $1,000 | Implemented |
AS0415 # 02 Y:2006 | 02 | 2006 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $2,463 | $24,000 | Not Implemented |