IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
NAICS 32599 All Other Chemical Product and Preparation Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CC0037 # 09 Y:2024 09 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $17,257 $183,891 n/a
CC0037 # 08 Y:2024 08 2024 INCREASE AMOUNT OF CONDENSATE RETURNED $2,800 $0 n/a
CC0037 # 07 Y:2024 07 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $11,158 $17,000 n/a
CC0037 # 06 Y:2024 06 2024 RECOVER WASTE HEAT FROM EQUIPMENT $1,010 $2,500 n/a
CC0037 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,282 $1,000 n/a
CC0037 # 04 Y:2024 04 2024 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,235 $0 n/a
CC0037 # 01 Y:2024 01 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,323 $22,680 n/a
CC0037 # 02 Y:2024 02 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,523 $8,400 n/a
CC0037 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,159 $1,880 n/a
NC0605 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,828 $10,328 Implemented
NC0605 # 07 Y:2017 07 2017 DEVELOP A REPAIR/REPLACE POLICY $3,455 $11,302 Implemented
NC0605 # 06 Y:2017 06 2017 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $65,888 $500 Implemented
NC0605 # 05 Y:2017 05 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $685 $2,000 Implemented
NC0605 # 04 Y:2017 04 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $812 $1,000 Not Implemented
NC0605 # 03 Y:2017 03 2017 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $118 $50 Implemented
NC0605 # 01 Y:2017 01 2017 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $23,044 $93,000 Not Implemented
NC0539 # 01 Y:2015 01 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $6,900 $3,517 Implemented
NC0539 # 02 Y:2015 02 2015 KEEP BOILER TUBES CLEAN $3,889 $2,000 Implemented
NC0539 # 03 Y:2015 03 2015 DEVELOP A REPAIR/REPLACE POLICY $2,085 $4,526 Implemented
NC0539 # 04 Y:2015 04 2015 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,453 $500 Not Implemented
NC0539 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,189 $3,822 Not Implemented
NC0539 # 06 Y:2015 06 2015 REPAIR AND ELIMINATE STEAM LEAKS $1,216 $2,500 Implemented
NC0539 # 07 Y:2015 07 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $357 $100 Implemented
NC0539 # 08 Y:2015 08 2015 INSTALL OCCUPANCY SENSORS $53 $200 Not Implemented