IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

43

matching recommendations
Reset
NAICS 32599 All Other Chemical Product and Preparation Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0544 # 07 Y:2023 07 2023 RECOVER WASTE HEAT FROM EQUIPMENT $25,000 $120,000 Not Implemented
LE0544 # 06 Y:2023 06 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $986 $2,000 Not Implemented
LE0544 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,260 $9,128 Not Implemented
LE0544 # 01 Y:2023 01 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,946 $100 Not Implemented
LE0544 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,153 $11,000 Not Implemented
LE0544 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,870 $2,400 Not Implemented
LE0544 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,184 $4,100 Implemented
LE0463 # 01 Y:2018 01 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,239 $70 Implemented
LE0463 # 02 Y:2018 02 2018 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $53,879 $30,500 Not Implemented
LE0463 # 03 Y:2018 03 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,825 $7,525 Not Implemented
LE0463 # 04 Y:2018 04 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $19,392 $30,000 Not Implemented
LE0463 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,792 $85,052 Implemented
LE0463 # 06 Y:2018 06 2018 REPLACE BOILER $9,096 $35,000 Not Implemented
LE0463 # 07 Y:2018 07 2018 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $21,624 $93,750 Implemented
WV0382 # 09 Y:2008 09 2008 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,240 $1,000 Not Implemented
WV0382 # 10 Y:2008 10 2008 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $3,383 $4,160 Not Implemented
WV0382 # 08 Y:2008 08 2008 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $4,689 $996 Implemented
WV0382 # 11 Y:2008 11 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,016 $195 Implemented
WV0382 # 15 Y:2008 15 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $766 $3,539 Implemented
WV0382 # 01 Y:2008 01 2008 REPAIR OR REPLACE STEAM TRAPS $165,919 $5,500 Implemented
WV0382 # 06 Y:2008 06 2008 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $9,768 $3,213 Implemented
WV0382 # 07 Y:2008 07 2008 RECOVER WASTE HEAT FROM EQUIPMENT $5,784 $224 Not Implemented
WV0382 # 04 Y:2008 04 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,388 $8,615 Not Implemented
WV0382 # 05 Y:2008 05 2008 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $11,112 $100,800 Not Implemented
WV0382 # 02 Y:2008 02 2008 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $109,212 $38,900 Implemented