Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
30
matching recommendationsNAICS | 32599 | All Other Chemical Product and Preparation Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0451 # 04 Y:2011 | 04 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,153 | $1,277 | Implemented |
UF0451 # 03 Y:2011 | 03 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,497 | $0 | Not Implemented |
UF0451 # 02 Y:2011 | 02 | 2011 | INSTALL COMMON HEADER ON COMPRESSORS | $8,773 | $222 | Implemented |
UF0451 # 01 Y:2011 | 01 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,739 | $0 | Implemented |
UF0451 # 05 Y:2011 | 05 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,440 | $3,310 | Implemented |
UF0451 # 07 Y:2011 | 07 | 2011 | ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS | $1,379 | $1,140 | Not Implemented |
UF0451 # 06 Y:2011 | 06 | 2011 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $498 | $0 | Implemented |
UF0451 # 08 Y:2011 | 08 | 2011 | USE OPTIMUM THICKNESS INSULATION | $1,327 | $1,865 | Not Implemented |
MA0681 # 02 Y:2011 | 02 | 2011 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $1,294 | $1,220 | Not Implemented |
MA0681 # 01 Y:2011 | 01 | 2011 | REDUCE VENTILATION AIR | $6,162 | $9,261 | Implemented |
MA0681 # 03 Y:2011 | 03 | 2011 | INSTALL OCCUPANCY SENSORS | $1,163 | $1,265 | Implemented |
MA0681 # 04 Y:2011 | 04 | 2011 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $768 | $300 | Not Implemented |
MA0681 # 05 Y:2011 | 05 | 2011 | INSULATE BARE EQUIPMENT | $152 | $80 | Not Implemented |
UF0445 # 06 Y:2011 | 06 | 2011 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,582 | $2,580 | Implemented |
UF0445 # 10 Y:2011 | 10 | 2011 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $118,931 | $150,000 | Not Implemented |
UF0445 # 09 Y:2011 | 09 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,370 | $8,778 | Implemented |
UF0445 # 08 Y:2011 | 08 | 2011 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $735 | $1,280 | Not Implemented |
UF0445 # 07 Y:2011 | 07 | 2011 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $802 | $1,378 | Not Implemented |
UF0445 # 05 Y:2011 | 05 | 2011 | INSTALL / REPAIR INSULATION ON STEAM LINES | $43,678 | $2,580 | Not Implemented |
UF0445 # 04 Y:2011 | 04 | 2011 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $25,323 | $75,000 | Implemented |
UF0445 # 03 Y:2011 | 03 | 2011 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $1,693 | $939 | Not Implemented |
UF0445 # 02 Y:2011 | 02 | 2011 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $5,543 | $9,823 | Not Implemented |
UF0445 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,864 | $4,542 | Implemented |
IA0463 # 03 Y:2011 | 03 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,748 | $3,095 | Not Implemented |
IA0463 # 01 Y:2011 | 01 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,055 | $500 | Not Implemented |