Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
35
matching recommendationsNAICS | 32599 | All Other Chemical Product and Preparation Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0543 # 01 Y:2019 | 01 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $107,586 | $164,741 | Implemented |
UF0543 # 03 Y:2019 | 03 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,476 | $0 | Implemented |
UF0543 # 02 Y:2019 | 02 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $33,229 | $88,272 | Implemented |
UF0541 # 02 Y:2019 | 02 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $40,964 | $16,606 | Implemented |
UF0541 # 05 Y:2019 | 05 | 2019 | INSTALL TURBULATORS | $5,920 | $7,500 | Not Implemented |
UF0541 # 06 Y:2019 | 06 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,871 | $1,550 | Implemented |
UF0541 # 01 Y:2019 | 01 | 2019 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $365,719 | $1,800,000 | Implemented |
UF0541 # 04 Y:2019 | 04 | 2019 | INSULATE BARE EQUIPMENT | $11,463 | $2,551 | Implemented |
UF0541 # 03 Y:2019 | 03 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $22,041 | $3,368 | Implemented |
UF0532 # 03 Y:2019 | 03 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,352 | $25,847 | Implemented |
UF0532 # 02 Y:2019 | 02 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $23,919 | $1,400 | Implemented |
UF0532 # 01 Y:2019 | 01 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $40,174 | $25,000 | Implemented |
UF0532 # 04 Y:2019 | 04 | 2019 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $1,403 | $5,998 | Not Implemented |
UF0532 # 05 Y:2019 | 05 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,301 | $421 | Implemented |
UF0532 # 06 Y:2019 | 06 | 2019 | INSULATE BARE EQUIPMENT | $1,094 | $230 | Not Implemented |
UF0532 # 07 Y:2019 | 07 | 2019 | REDUCE OR ELIMINATE WASTE | $19,196 | $40,500 | Implemented |
UF0530 # 04 Y:2019 | 04 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $43,693 | $25,000 | Implemented |
UF0530 # 08 Y:2019 | 08 | 2019 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $1,535 | $5,998 | Not Implemented |
UF0530 # 05 Y:2019 | 05 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,859 | $22,491 | Not Implemented |
UF0530 # 03 Y:2019 | 03 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $47,739 | $25,000 | Implemented |
UF0530 # 02 Y:2019 | 02 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $60,494 | $202,420 | Implemented |
UF0530 # 01 Y:2019 | 01 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $94,823 | $80,000 | Implemented |
IP0119 # 06 Y:2019 | 06 | 2019 | REPLACE BOILER | $20,712 | $66,681 | Implemented |
IP0119 # 05 Y:2019 | 05 | 2019 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $27,937 | $38,052 | Implemented |
IP0119 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,082 | $379 | Not Implemented |