IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
NAICS 325991 Custom Compounding of Purchased Resins
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0294 # 11 Y:2023 11 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $88 $100 Implemented
TT0294 # 10 Y:2023 10 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $974 $500 Implemented
TT0294 # 09 Y:2023 09 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,938 $40 Not Implemented
TT0294 # 08 Y:2023 08 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,236 $7,500 Implemented
TT0294 # 07 Y:2023 07 2023 USE SOLAR HEAT FOR HEAT $4,761 $15,950 Not Implemented
TT0294 # 06 Y:2023 06 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,671 $500 Implemented
TT0294 # 05 Y:2023 05 2023 AIR CONDITION ONLY SPACE NECESSARY $6,563 $18,000 Not Implemented
TT0294 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,950 $3,100 Implemented
TT0294 # 03 Y:2023 03 2023 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $14,815 $12,000 Implemented
TT0294 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,944 $43,883 Implemented
TT0294 # 01 Y:2023 01 2023 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $77,940 $2,000 Implemented
TT0289 # 06 Y:2023 06 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $61,137 $119,000 Implemented
TT0289 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,719 $1,609 Not Implemented
TT0289 # 04 Y:2023 04 2023 RECOVER WASTE HEAT FROM EQUIPMENT $13,798 $13,000 Implemented
TT0289 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,799 $2,000 Not Implemented
TT0289 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,365 $1,405 Implemented
TT0289 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,836 $40 Implemented
TT0162 # 01 Y:2015 01 2015 RECOVER WASTE HEAT FROM EQUIPMENT $19,039 $10,000 Implemented
TT0162 # 07 Y:2015 07 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $1,792 $1,075 Not Implemented
TT0162 # 06 Y:2015 06 2015 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,012 $2,000 Not Implemented
TT0162 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,958 $3,000 Implemented
TT0162 # 04 Y:2015 04 2015 INSTALL SPECTRAL REFLECTORS / DELAMP $5,229 $706 Not Implemented
TT0162 # 03 Y:2015 03 2015 INSTALL OCCUPANCY SENSORS $7,531 $16,988 Not Implemented
TT0162 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,231 $11,000 Not Implemented