IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

242

matching recommendations
Reset
NAICS 325998 All Other Miscellaneous Chemical Product and Preparation Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0297 # 15 Y:2024 15 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,222 $0 Implemented
IC0297 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $29,288 $1,336 Implemented
IC0297 # 03 Y:2024 03 2024 INSULATE BARE EQUIPMENT $2,641 $1,066 Implemented
IC0297 # 04 Y:2024 04 2024 INSULATE BARE EQUIPMENT $26,122 $13,370 Implemented
IC0297 # 14 Y:2024 14 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $119 $0 Implemented
IC0297 # 13 Y:2024 13 2024 REPAIR AND ELIMINATE STEAM LEAKS $4,854 $360 Implemented
IC0297 # 02 Y:2024 02 2024 INSULATE BARE EQUIPMENT $5,801 $2,620 Implemented
IC0297 # 12 Y:2024 12 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,395 $609 Implemented
IC0297 # 10 Y:2024 10 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $6,801 $0 Implemented
IC0297 # 08 Y:2024 08 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,754 $36,000 Implemented
IC0297 # 05 Y:2024 05 2024 USE OPTIMUM THICKNESS INSULATION $2,433 $1,693 Implemented
SJ0008 # 05 Y:2023 05 2023 INSULATE BARE EQUIPMENT $265 $344 Implemented
SJ0008 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $365 $0 Implemented
LS2317 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $344 $45 Implemented
LS2317 # 05 Y:2023 05 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $535 $4,530 Implemented
LS2317 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $511 $476 Implemented
LS2317 # 03 Y:2023 03 2023 INSTALL OCCUPANCY SENSORS $207 $175 Implemented
LS2317 # 02 Y:2023 02 2023 INSTALL TIMERS AND/OR THERMOSTATS $223 $50 Implemented
UL2301 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,408 $2,832 Implemented
UD1056 # 05 Y:2023 05 2023 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $17,114 $3,100 Implemented
UD1056 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,573 $0 Implemented
UD1056 # 06 Y:2023 06 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,784 $0 Implemented
UD1056 # 03 Y:2023 03 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,193 $0 Implemented
UD1056 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,474 $250 Implemented
UD1056 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $36,442 $0 Implemented