Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
596
matching recommendationsNAICS | 325998 | All Other Miscellaneous Chemical Product and Preparation Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0548 # 04 Y:2017 | 04 | 2017 | DISCONNECT BALLASTS | $4,196 | $2,050 | Implemented |
SD0548 # 05 Y:2017 | 05 | 2017 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $3,756 | $9,629 | Not Implemented |
SD0548 # 06 Y:2017 | 06 | 2017 | INSTALL OCCUPANCY SENSORS | $2,573 | $5,317 | Implemented |
SD0548 # 07 Y:2017 | 07 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,113 | $1,500 | Implemented |
SD0548 # 08 Y:2017 | 08 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,052 | $360 | Implemented |
SD0548 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,809 | $47,543 | Implemented |
SD0548 # 02 Y:2017 | 02 | 2017 | USE PHOTOCELL CONTROLS | $4,954 | $5,368 | Implemented |
MA0754 # 01 Y:2016 | 01 | 2016 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $1,595,248 | $5,445,000 | Not Implemented |
MA0754 # 02 Y:2016 | 02 | 2016 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $112,215 | $1,000 | Not Implemented |
MA0754 # 03 Y:2016 | 03 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $71,309 | $500,000 | Not Implemented |
MA0754 # 04 Y:2016 | 04 | 2016 | INCREASE AMOUNT OF CONDENSATE RETURNED | $62,104 | $250,000 | Not Implemented |
MA0754 # 05 Y:2016 | 05 | 2016 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $34,769 | $3,000 | Implemented |
MA0754 # 06 Y:2016 | 06 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,043 | $13,895 | Implemented |
MA0754 # 07 Y:2016 | 07 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,913 | $4,940 | Implemented |
MA0754 # 08 Y:2016 | 08 | 2016 | REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE | $1,151 | $500 | Not Implemented |
NC0539 # 01 Y:2015 | 01 | 2015 | INSTALL / REPAIR INSULATION ON STEAM LINES | $6,900 | $3,517 | Implemented |
NC0539 # 02 Y:2015 | 02 | 2015 | KEEP BOILER TUBES CLEAN | $3,889 | $2,000 | Implemented |
NC0539 # 03 Y:2015 | 03 | 2015 | DEVELOP A REPAIR/REPLACE POLICY | $2,085 | $4,526 | Implemented |
NC0539 # 04 Y:2015 | 04 | 2015 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $1,453 | $500 | Not Implemented |
NC0539 # 05 Y:2015 | 05 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,189 | $3,822 | Not Implemented |
NC0539 # 06 Y:2015 | 06 | 2015 | REPAIR AND ELIMINATE STEAM LEAKS | $1,216 | $2,500 | Implemented |
NC0539 # 07 Y:2015 | 07 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $357 | $100 | Implemented |
NC0539 # 08 Y:2015 | 08 | 2015 | INSTALL OCCUPANCY SENSORS | $53 | $200 | Not Implemented |
SF0457 # 01 Y:2014 | 01 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,158 | $180 | Not Implemented |
SF0457 # 02 Y:2014 | 02 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,323 | $0 | Not Implemented |