IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

548

matching recommendations
Reset
NAICS 325998 All Other Miscellaneous Chemical Product and Preparation Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0854 # 05 Y:2008 05 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,990 $80,000 Not Implemented
GT0854 # 06 Y:2008 06 2008 REDUCE EXCESSIVE BOILER BLOWDOWN $4,690 $0 Not Implemented
GT0854 # 07 Y:2008 07 2008 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $9,141 $10,000 Not Implemented
GT0854 # 08 Y:2008 08 2008 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $14,260 $23,000 Implemented
GT0854 # 09 Y:2008 09 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,015 $35,125 Implemented
AM0540 # 01 Y:2008 01 2008 REPAIR OR REPLACE STEAM TRAPS $700,000 $117,000 Implemented
AM0540 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $97,610 $1,000 Implemented
AM0540 # 03 Y:2008 03 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $12,800 $3,000 Implemented
AM0540 # 04 Y:2008 04 2008 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $15,410 $5,000 Implemented
AM0540 # 05 Y:2008 05 2008 REPAIR AND ELIMINATE STEAM LEAKS $12,850 $2,000 Implemented
AM0540 # 06 Y:2008 06 2008 USE SYNTHETIC LUBRICANT $5,820 $0 Implemented
AM0540 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $980 $715 Implemented
UF0396 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,223 $4,805 Not Implemented
UF0396 # 02 Y:2007 02 2007 INSTALL OCCUPANCY SENSORS $364 $1,126 Not Implemented
UF0396 # 03 Y:2007 03 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,125 $6,679 Not Implemented
UF0396 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,101 $642 Implemented
UF0396 # 05 Y:2007 05 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $282 $609 Implemented
UF0396 # 06 Y:2007 06 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $347 $0 Implemented
UF0396 # 07 Y:2007 07 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $731 $810 Implemented
UF0396 # 08 Y:2007 08 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,401 $0 Implemented
UF0396 # 09 Y:2007 09 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,300 $477 Implemented
UF0396 # 10 Y:2007 10 2007 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $72,041 $30,000 Not Implemented
UF0396 # 11 Y:2007 11 2007 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,041 $4,160 Not Implemented
UF0396 # 12 Y:2007 12 2007 $7,488 $970 Not Implemented
SD0391 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,231 $22,654 Implemented