Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
51
matching recommendationsNAICS | 325998 | All Other Miscellaneous Chemical Product and Preparation Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1056 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $36,442 | $0 | Implemented |
UD1056 # 03 Y:2023 | 03 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,193 | $0 | Implemented |
UD1056 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,573 | $0 | Implemented |
UD1056 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,474 | $250 | Implemented |
UD0887 # 02 Y:2013 | 02 | 2013 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $1,438 | $0 | Implemented |
UD0887 # 12 Y:2013 | 12 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $500 | $0 | Not Implemented |
UD0887 # 01 Y:2013 | 01 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,553 | $50 | Implemented |
UD0887 # 03 Y:2013 | 03 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $497 | $500 | Implemented |
UD0887 # 04 Y:2013 | 04 | 2013 | INSTALL SPECTRAL REFLECTORS / DELAMP | $8,763 | $2,075 | Implemented |
UD0887 # 05 Y:2013 | 05 | 2013 | ADD AREA LIGHTING SWITCHES | $3,141 | $350 | Not Implemented |
UD0887 # 06 Y:2013 | 06 | 2013 | ADD AREA LIGHTING SWITCHES | $594 | $350 | Implemented |
UD0887 # 07 Y:2013 | 07 | 2013 | OPTIMIZE PLANT POWER FACTOR | $19,173 | $10,000 | Not Implemented |
UD0887 # 08 Y:2013 | 08 | 2013 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $10,244 | $0 | Not Implemented |
UD0887 # 09 Y:2013 | 09 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,136 | $4,000 | Not Implemented |
UD0887 # 10 Y:2013 | 10 | 2013 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $187 | $300 | Not Implemented |
UD0887 # 11 Y:2013 | 11 | 2013 | DEVELOP A REPAIR/REPLACE POLICY | $2,637 | $3,420 | Implemented |
UD0887 # 13 Y:2013 | 13 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $383 | $0 | Implemented |
WV0448 # 06 Y:2012 | 06 | 2012 | USE RADIANT HEATER FOR SPOT HEATING | $1,968 | $10,438 | Not Implemented |
WV0448 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,725 | $9,258 | Implemented |
WV0448 # 02 Y:2012 | 02 | 2012 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $5,053 | $51,600 | Not Implemented |
WV0448 # 03 Y:2012 | 03 | 2012 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,859 | $16,925 | Not Implemented |
WV0448 # 04 Y:2012 | 04 | 2012 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $3,243 | $14,500 | Not Implemented |
WV0448 # 05 Y:2012 | 05 | 2012 | INSTALL OCCUPANCY SENSORS | $1,979 | $1,826 | Implemented |
WV0448 # 09 Y:2012 | 09 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $117 | $7 | Implemented |
WV0448 # 08 Y:2012 | 08 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,103 | $1,000 | Implemented |