Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
NAICS 325998 All Other Miscellaneous Chemical Product and Preparation Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0871 # 08 Y:2010 08 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,500 $12,000 Not Implemented
GT0871 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,563 $17,696 Implemented
GT0871 # 06 Y:2010 06 2010 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $16,535 $11,000 Not Implemented
GT0871 # 05 Y:2010 05 2010 UPGRADE CONTROLS ON COMPRESSORS $3,635 $22,000 Not Implemented
GT0871 # 04 Y:2010 04 2010 INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK $119,576 $25,000 Not Implemented
GT0871 # 03 Y:2010 03 2010 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $40,118 $23,620 Implemented
GT0871 # 02 Y:2010 02 2010 INCREASE AMOUNT OF CONDENSATE RETURNED $20,114 $23,200 Not Implemented
GT0871 # 01 Y:2010 01 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $2,860 $768 Implemented
GT0854 # 05 Y:2008 05 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,990 $80,000 Not Implemented
GT0854 # 09 Y:2008 09 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,015 $35,125 Implemented
GT0854 # 08 Y:2008 08 2008 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $14,260 $23,000 Implemented
GT0854 # 07 Y:2008 07 2008 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $9,141 $10,000 Not Implemented
GT0854 # 06 Y:2008 06 2008 REDUCE EXCESSIVE BOILER BLOWDOWN $4,690 $0 Not Implemented
GT0854 # 04 Y:2008 04 2008 REPAIR OR REPLACE STEAM TRAPS $25,424 $5,000 Implemented
GT0854 # 03 Y:2008 03 2008 INCREASE AMOUNT OF CONDENSATE RETURNED $5,970 $2,500 Not Implemented
GT0854 # 02 Y:2008 02 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,745 $3,000 Implemented
GT0854 # 01 Y:2008 01 2008 REPAIR AND ELIMINATE STEAM LEAKS $2,568 $700 Implemented
GT0746 # 01 Y:2003 01 2003 UTILIZE A LESS EXPENSIVE COOLING METHOD $11,932 $44,000 Not Implemented
GT0746 # 08 Y:2003 08 2003 INSTALL OCCUPANCY SENSORS $227 $150 Not Implemented
GT0746 # 07 Y:2003 07 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,222 $14,500 Not Implemented
GT0746 # 06 Y:2003 06 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,357 $20,000 Not Implemented
GT0746 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $593 $0 Implemented
GT0746 # 04 Y:2003 04 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,727 $2,500 Implemented
GT0746 # 03 Y:2003 03 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $12,113 $28,000 Not Implemented
GT0746 # 02 Y:2003 02 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,422 $0 Not Implemented