IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,415

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0940 # 03 Y:2016 03 2016 INSULATE BARE EQUIPMENT $15,056 $750 Not Implemented
UD0940 # 04 Y:2016 04 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,308 $0 Implemented
UD0940 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $4,195 $1,683 Not Implemented
UD0940 # 06 Y:2016 06 2016 RECOVER WASTE HEAT FROM EQUIPMENT $2,717 $1,500 Implemented
UD0940 # 07 Y:2016 07 2016 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,236 $5,400 Not Implemented
UD0940 # 08 Y:2016 08 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,111 $29 Implemented
UD0940 # 09 Y:2016 09 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $920 $1,000 Implemented
UD0940 # 10 Y:2016 10 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,879 $3,100 Not Implemented
UD0940 # 11 Y:2016 11 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,440 $2,275 Not Implemented
UD0940 # 12 Y:2016 12 2016 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,892 $5,000 Implemented
OK0932 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,787 $14,515 Not Implemented
OK0932 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,916 $7,335 Not Implemented
OK0932 # 03 Y:2016 03 2016 USE RADIANT HEATER FOR SPOT HEATING $3,703 $11,940 Not Implemented
OK0932 # 04 Y:2016 04 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,740 $2,829 Not Implemented
OK0932 # 05 Y:2016 05 2016 RECOVER WASTE HEAT FROM EQUIPMENT $481 $460 Not Implemented
OK0932 # 06 Y:2016 06 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $52 $175 Not Implemented
OK0932 # 07 Y:2016 07 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $240 $125 Not Implemented
OK0932 # 08 Y:2016 08 2016 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,679 $12,315 Not Implemented
OK0932 # 09 Y:2016 09 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $429 $0 Not Implemented
OK0932 # 10 Y:2016 10 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,093 $30,000 Not Implemented
OK0932 # 11 Y:2016 11 2016 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $3,216 $871 Not Implemented
OK0932 # 12 Y:2016 12 2016 OPERATE BOILERS ON HIGH FIRE SETTING $16,492 $0 Implemented
OK0932 # 13 Y:2016 13 2016 REPAIR AND ELIMINATE STEAM LEAKS $4,272 $1,100 Implemented
OK0932 # 14 Y:2016 14 2016 SHUT OFF STEAM TRAPS ON SUPER HEATED STEAM LINES WHEN NOT IN USE $4,116 $0 Not Implemented
SD0521 # 01 Y:2016 01 2016 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $63,923 $80,120 Not Implemented