Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
410
matching recommendationsNAICS | 326 | Plastics and Rubber Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0247 # 11 Y:2003 | 11 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $606 | $500 | Implemented |
BD0247 # 12 Y:2003 | 12 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $235 | $0 | Not Implemented |
BD0247 # 13 Y:2003 | 13 | 2003 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $8,829 | $336 | Implemented |
BD0247 # 14 Y:2003 | 14 | 2003 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $1,890 | $240 | Implemented |
BD0247 # 15 Y:2003 | 15 | 2003 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $34,400 | $10,000 | Implemented |
BD0247 # 16 Y:2003 | 16 | 2003 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $10,920 | $5,000 | Implemented |
UD0684 # 01 Y:2003 | 01 | 2003 | DEVELOP STANDARD OPERATING PROCEDURES | $34,560 | $0 | Implemented |
UD0684 # 02 Y:2003 | 02 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,504 | $37,800 | Not Implemented |
UD0684 # 03 Y:2003 | 03 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,995 | $29,250 | Not Implemented |
UD0684 # 04 Y:2003 | 04 | 2003 | OPTIMIZE PLANT POWER FACTOR | $15,725 | $6,450 | Not Implemented |
UD0684 # 05 Y:2003 | 05 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,700 | $770 | Not Implemented |
UD0684 # 06 Y:2003 | 06 | 2003 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $4,792 | $100 | Not Implemented |
UD0684 # 07 Y:2003 | 07 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,780 | $0 | Not Implemented |
UD0684 # 08 Y:2003 | 08 | 2003 | INSTALL COMMON HEADER ON COMPRESSORS | $3,865 | $0 | Not Implemented |
UD0684 # 09 Y:2003 | 09 | 2003 | INSULATE BARE EQUIPMENT | $3,252 | $8,000 | Not Implemented |
UD0684 # 10 Y:2003 | 10 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,396 | $613 | Not Implemented |
UD0684 # 11 Y:2003 | 11 | 2003 | METER WASTE WATER | $1,513 | $2,000 | Not Implemented |
UD0684 # 12 Y:2003 | 12 | 2003 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $3,323 | $3,503 | Not Implemented |
UD0684 # 13 Y:2003 | 13 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,290 | $660 | Not Implemented |
UD0684 # 14 Y:2003 | 14 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $1,207 | $4,000 | Not Implemented |
UD0684 # 15 Y:2003 | 15 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,000 | $1,400 | Not Implemented |
UD0684 # 16 Y:2003 | 16 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $965 | $0 | Not Implemented |
UD0684 # 17 Y:2003 | 17 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $580 | $110 | Not Implemented |
BD0245 # 01 Y:2003 | 01 | 2003 | USE POWER DURING OFF-PEAK PERIODS | $8,991 | $2,000 | Not Implemented |
BD0245 # 02 Y:2003 | 02 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,603 | $6,590 | Implemented |