Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,415
matching recommendationsNAICS | 326 | Plastics and Rubber Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0653 # 04 Y:2024 | 04 | 2024 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $3,133 | $8,720 | n/a |
SD0653 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,223 | $1,822 | n/a |
SD0653 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $995 | $2,202 | n/a |
SD0653 # 07 Y:2024 | 07 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,867 | $3,608 | n/a |
SD0653 # 08 Y:2024 | 08 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $751 | $500 | n/a |
SD0653 # 09 Y:2024 | 09 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $15,105 | $27,075 | n/a |
SD0653 # 10 Y:2024 | 10 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $38,544 | $64,866 | n/a |
SD0653 # 11 Y:2024 | 11 | 2024 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $275 | $157 | n/a |
SD0653 # 12 Y:2024 | 12 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $50,979 | $44,800 | n/a |
IP0189 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,450 | $33 | Implemented |
IP0189 # 02 Y:2024 | 02 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,822 | $0 | Implemented |
IP0189 # 03 Y:2024 | 03 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,852 | $325 | Implemented |
IP0189 # 04 Y:2024 | 04 | 2024 | INSTALL OCCUPANCY SENSORS | $1,248 | $716 | Implemented |
IP0189 # 05 Y:2024 | 05 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $43,723 | $84,496 | Implemented |
IC0298 # 01 Y:2024 | 01 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,466 | $2,200 | n/a |
IC0298 # 02 Y:2024 | 02 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $19,913 | $4,400 | n/a |
IC0298 # 03 Y:2024 | 03 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $3,568 | $280 | n/a |
IC0298 # 04 Y:2024 | 04 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $14,618 | $558 | n/a |
IC0298 # 05 Y:2024 | 05 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $216,800 | $1,202,971 | n/a |
IC0298 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,839 | $0 | n/a |
IC0298 # 07 Y:2024 | 07 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $352 | $0 | n/a |
IC0298 # 08 Y:2024 | 08 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $63 | $0 | n/a |
IC0298 # 09 Y:2024 | 09 | 2024 | INSULATE BARE EQUIPMENT | $259 | $259 | n/a |
IC0298 # 10 Y:2024 | 10 | 2024 | INSULATE BARE EQUIPMENT | $18,765 | $12,716 | n/a |
IC0298 # 11 Y:2024 | 11 | 2024 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,685 | $6,178 | n/a |