IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

627

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0410 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $33,992 $2,250 Implemented
SD0410 # 04 Y:2008 04 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $28,203 $56,758 Implemented
SD0410 # 05 Y:2008 05 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,826 $81,570 Not Implemented
SD0410 # 06 Y:2008 06 2008 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $24,980 $0 Implemented
SD0410 # 07 Y:2008 07 2008 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $22,978 $11,522 Not Implemented
SD0410 # 08 Y:2008 08 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,624 $24,471 Not Implemented
SD0410 # 09 Y:2008 09 2008 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $10,867 $500 Not Implemented
SD0410 # 10 Y:2008 10 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,041 $5,849 Not Implemented
SD0410 # 11 Y:2008 11 2008 INSTALL SKYLIGHTS $7,467 $22,980 Implemented
SD0410 # 12 Y:2008 12 2008 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,185 $0 Not Implemented
SF0351 # 12 Y:2008 12 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,836 $93,064 Implemented
SF0351 # 11 Y:2008 11 2008 INSULATE BARE EQUIPMENT $493 $979 Not Implemented
SF0351 # 01 Y:2008 01 2008 REPAIR AND ELIMINATE STEAM LEAKS $3,571 $0 Implemented
SF0351 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,336 $0 Implemented
SF0351 # 03 Y:2008 03 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,240 $150 Not Implemented
SF0351 # 04 Y:2008 04 2008 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,173 $0 Not Implemented
SF0351 # 05 Y:2008 05 2008 INSULATE BARE EQUIPMENT $584 $0 Not Implemented
SF0351 # 06 Y:2008 06 2008 INSTALL OCCUPANCY SENSORS $2,396 $290 Not Implemented
SF0351 # 07 Y:2008 07 2008 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,173 $228 Not Implemented
SF0351 # 08 Y:2008 08 2008 INSULATE BARE EQUIPMENT $685 $503 Not Implemented
SF0351 # 09 Y:2008 09 2008 REDUCE EXCESSIVE BOILER BLOWDOWN $1,877 $2,802 Not Implemented
SF0351 # 10 Y:2008 10 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,144 $1,792 Not Implemented
SF0350 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,920 $300 Implemented
SF0350 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,274 $1,332 Implemented
SF0350 # 03 Y:2007 03 2007 INSTALL OCCUPANCY SENSORS $399 $492 Implemented