IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

433

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0063 # 07 Y:2015 07 2015 INSULATE BARE EQUIPMENT $1,484 $603 Not Implemented
WM0063 # 08 Y:2015 08 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $57,847 $55,000 Not Implemented
IP0033 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,557 $0 Implemented
IP0033 # 02 Y:2015 02 2015 INSTALL OCCUPANCY SENSORS $1,742 $240 Implemented
IP0033 # 03 Y:2015 03 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $520 $144 Not Implemented
IP0033 # 04 Y:2015 04 2015 USE BATCH FIRING WITH KILN "FURNITURE" SPECIFICALLY DESIGNED $4,925 $3,000 Not Implemented
IP0033 # 05 Y:2015 05 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,961 $1,864 Implemented
IP0033 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,018 $3,232 Implemented
IP0033 # 07 Y:2015 07 2015 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,865 $3,720 Not Implemented
IP0033 # 08 Y:2015 08 2015 OPTIMIZE PLANT POWER FACTOR $4,939 $10,200 Implemented
IP0033 # 09 Y:2015 09 2015 REPLACE AIR CURTAIN DOORS WITH SOLID DOORS $6,096 $25,603 Not Implemented
DL0139 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,375 $19,745 Not Implemented
DL0139 # 02 Y:2015 02 2015 RECOVER WASTE HEAT FROM EQUIPMENT $11,510 $2,330 Not Implemented
DL0139 # 03 Y:2015 03 2015 USE HEAT PUMP FOR SPACE CONDITIONING $4,240 $9,280 Not Implemented
DL0139 # 04 Y:2015 04 2015 REDUCE VENTILATION AIR $850 $0 Not Implemented
DL0139 # 05 Y:2015 05 2015 INSTALL TIMERS AND/OR THERMOSTATS $6,100 $710 Not Implemented
DL0139 # 06 Y:2015 06 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,120 $0 Not Implemented
DL0139 # 07 Y:2015 07 2015 INSTALL TIMERS AND/OR THERMOSTATS $320 $710 Not Implemented
DL0139 # 08 Y:2015 08 2015 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $320 $90 Not Implemented
DL0139 # 09 Y:2015 09 2015 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $810 $700 Not Implemented
DL0139 # 10 Y:2015 10 2015 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,040 $22,500 Not Implemented
AM0673 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $34,785 $15,000 Implemented
AM0673 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $26,669 $18 Implemented
AM0673 # 03 Y:2015 03 2015 INCREASE AMOUNT OF CONDENSATE RETURNED $26,256 $6,650 Not Implemented
AM0673 # 04 Y:2015 04 2015 USE SYNTHETIC LUBRICANT $5,862 $0 Implemented